Dharmapasha Rui Beel Feasibility Study


Location

Sunamganj and Netrokona Districts

 

Type of Project

Flood Control & Drainage

 

Period of Study

September, 1999 - November, 1999

 

Client

Bangladesh Water Development Board


Description

Mathematical Modelling study of the Dharmapasha-Ruibeel FCD Project was conceived to understand the complex drainage system of the project area. The model considers the drainage system of the study area in a comprehensive way to simulate water level, discharge in the canal systems due to internal rainfall and inflow from external sources. The impact of any structural intervention on drainage, flood control and irrigation system can easily be evaluated from model results. Thus the model helps the planners and decision-makers to choose the right type and dimension of the structures for drainage improvement. Including most of the defined rivers/khals of the study area the mathematical model for the Dharmapasha-Ruibeel FCD Project was developed. The external boundaries for the project model were taken from the existing North East Regional Model. The objective of the study was to understand the complex behaviour of rivers and khals in and around the Dharmapasha-Ruibeel FCD Project and help the feasibility study team to select suitable intervention measures for improving drainage condition and flood control of this area.

The mathematical modelling study was designed to understand the drainage and flooding situation inside the project during pre monsoon, monsoon and post monsoon by comparing model results of existing situation and different improvement options. The definite output from the model were listed below:

  • An updated one-dimensional mathematical model for the North East Region with finer resolution in the Dharmapasha-Ruibeel FCD Project area.

  • Digital Elevation Model (DEM) for the project.

  • Flood maps/ inundation maps showing the area of different classes of land (F0, F1, F2 & F3) under the existing situation and different development options to indicate the extent of benefit due to the implementation of the project