|
|
|
|
|
|
|
Support to Channel Dredging at Mongla Port Entry |
|
|
|
|
|
Location |
Mongla Port
|
|
Type of Project |
Hydrographic Survey
|
|
Period of Study |
December 2002
|
|
Client |
BASIC Dredging Co. Ltd.
|
|
|
|
|
|
|
Bathymetric
Chart for Mongla Port |
|
|
|
|
|
PROJECT DESCRIPTION: The Mongla Port is an important seaport of
Bangladesh. The Jetty Channel in front of the port is facing serious
problem due to siltation. The Basic Dredging Co. Ltd. has been entrusted
to carry out the dredging works in front of the area. Hydrographic survey
at the pre and post dredge situation is essential to calculate the volume
of dredging. The survey was also useful to guide the dredger for
maintaining proper alignment of the dredging channel. In this connection
the Basic Dredging approached IWM to carryout the hydrographic survey. The
work was so useful that without this it might not even be possible to
accomplish a successful dredging within the stipulated time and resources. The output are include the following:
Equipment used : RTK GPS, Echosounder Software used : Hydro Pro, Auto CAD |
|
|
|
|