CV of MTH
|
PROFILE OF MUSTAFA TANVEER HASAN
|
|
Junior Engineer
|
|
 |
Division |
: Water Resources Planning Division
|
| E MAIL |
:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
|
| Land Phone |
:
|
| Mobile Phone |
: 01712341234 |
| |
| Academic Chronology |
Mustafa Tanveer Hasan has obtained Bachelor of Science in Civil Engineering on March, 2009 from Bangladesh University of Engineering and Technology (BUET).
|
| Professional Track Record |
Mr. Hasan has joined Institute of Water Modelling (IWM) on 19th October, 2009. Since then he has been working in the Water Resources Planning Division (WRP). His experiences cover Water Distribution Network Modelling, Demand Analysis for Water Distribution Network, Data Collection & Analysis for Water Consumption Assessment, GIS Based Land Use Analysis for Forecasting of Water Demand, Rainfall Data Analysis for NAM modeling, Analytical and Mathematical Modeling for Drainage Improvement Plan of Pourashavas.
|
Training/Membership/ Workshop/Seminar/Publication etc. |
Mr. Hasan has participated in few training programs as a trainee in IWM. Just after joining in IWM, he has received the inaugural training from IWM. Later he has been included in the training program on “Hydro-Geological Investigation for Ground Water Modeling”. He has also performed as trainer of DPHE engineers on the topic of WATER DISTRIBUTION NETWORK MODELLING. Mr. Hasan is an Associate Member of The Institution of Engineers, Bangladesh (IEB). Participated in Master Plan Presentation on Water Supply, Drainage and Sewerage in connection with project titled as “Groundwater Management and Feasibility Study for 148 Pourashava having no piped water supply” in Alamdanga and Manirampur Pourashavas.
Articles in Conference Proceedings: Hasan, M. T. and Amin, M. R. “Preparing a Water Supply Master Plan for a Newly Declared City Lacking Land Use Guidelines and Demographic Information”. 10th International Symposium of Urban Safety for Mega Cities in Asia. Chiang Mai, Thailand, 2011.
|
| Major Project Assignment |
- Groundwater Management and Feasibility Study for 148 Pourashava having no piped water supply
- Detailed Water Quantity Measurement for Khulna City
|
|
|
©www.iwmbd.org
|
|