Phone: +88 02 55087611-4 Email: iwm@iwmbd.org webmail Sign In

Profile of Md. Mahmudul Hasan Khandkar


hnk

BASIC DETAILS

Name Md. Mahmudul Hasan Khandkar
Division Water Supply, Sanitation and Urban Water Management (WSU)
Designation Sub Assistant Resident Engineer
Phone
Mobile 01812383820
Email hnk@iwmbd.org


PROFILE DESCRIPTIONS

Academic Chronology

Mohammed Mahmudul Hasan Khandokar began his academic journey with a Diploma in Civil Engineering from Feni Polytechnic Institute (FPI) in 2012, followed by a Bachelor of Science in Civil Engineering from the World University of Bangladesh (WUB), which he successfully completed in 2017.

Professional Track Record

Since January 2020, Mr. Mohammed Mahmudul Hasan Khandokar has been working at the Institute of Water Modelling (IWM), where he is involved in quantity and cost estimation (water supply systems, sewerage systems, drainage systems, buildings, bridges,  hydraulic structures, WTP & STP), BOQ preparation as per PWD, BWDB, LGED, and RHD SOR, rate analysis, construction monitoring, daily site supervision, quality assurance of materials and works, and vetting of contractors’ bills. He also supports the Team Leader through report preparation, technical coordination with subcontractors, issuing site instructions, and preparing measurement-based bills upon completion.

From January 2019 to January 2020, he served as an Assistant Engineer at Ellipse Engineering & Construction Ltd., responsible for material estimation, BOQ preparation, cost assessments, Green Building construction works, and Sewage Treatment Plant (STP) supervision. He prepared structural/architectural/as-built drawings, monitored construction quality, checked structural and finishing works, ensured material compliance, resolved site issues, revised drawings, and inspected reinforcement and footing conditions as per design.

Between January 2017 and January 2018, Mr. Khandokar worked at Sharina Corporation Ltd. as an Assistant Engineer, where he prepared budgets and BOQs, supervised multiple civil projects, coordinated contractors and labor, ensured material and work quality, prepared running bills, assisted in planning, and maintained work schedules.

From January 2013 to November 2016, he served as a Site Engineer (Civil) & CAD Officer at Pakiza Knit Composite Ltd., where he was involved in material estimation, preparation of structural/architectural/as-built drawings, layout surveys, supervision of cast-in-situ and pre-cast piling, pile load testing, bar bending schedules, and monitoring construction quality. He also inspected reinforcement detailing, prepared structural assessment reports, and supported compliance for Accord and Alliance audits.

Training/Membership/Workshop/Seminar/Publication etc.

Training:

Training onPlan Swift & Blue Beam takeoff Software”.

Training onPublic Procurement Management & e-GP Tender”.

Training onProject Management with MS Project professional”.   

Training on “Microsoft Word, Excel, Access, Power Point”.

Training on “AUTO CAD” held at WUB & FPI.

Training on “ETABSheld at WUB.

Training on “Revit Structure” held at Cad Sure Institute.

Training on “Plumbing & Sanitary Work Design” held at 3c Engineering & Research Institute.

Training on “Steel Building Estimation, Cost & Profit Analysis by Using Excel” held at 3c Engineering & Research Institute.

Training on “Basic of Civil 3D Software” held at IWM Training Room.

Membership:

Member, Institution of Diploma Engineers Bangladesh (IDEB)

  •  M-70554

Major Project Assignment

  1. Detailed Design, Drawings and Construction Supervision of Water Supply, Drainage, Sewerage System, Gas Transmission, Electrical & Structural Design for Trust Green City Area.
  2. Feasibility study for the management of Karatoa river system and rehabilitation of FCD projects on both banks of Nagar River in Bogura District.

(Design of Khulshi Regulator (4-3.00X3.30)

  1.  Consultancy services for design and construction supervision under establishment of offsite water intake facility for rooppur nuclear power plant
  2. Planning & Design of Community piped Water Supply System for Rohingya Camps
  3. Feasibility Study for Flood Management and Reduction of Drainage Congestion in Sylhet Metropolitan Area.
  4. Consultancy Services for Construction of DWASA Production Tube wells (including new Installing/Replacement/Rehabilitation) Iron Removal Plants and Rainwater Harvesting Plants under Emergency Water Supply Project and Feasibility Study for Sustainable Water Supply Project (Phase-01)  
  5. Production tube well (daily progress by a site visit, sieve analysis interpretation, Design review, close supervision of fixture lowering, gravel packing, development work even stays at night in the site) 10 nos. IRP &10 nos. Rainwater Harvesting System (Managed Aquifer Recharge).
  6. Development of Water Distribution and Supply Facilities at Purbachal New Town in Dhaka
  7. Establishment of Bangladesh Maritime University Campus in Chattogram
  8. Expansion of Drainage Network and Development of Canal in Dhaka City
  9. Design & Construction of Industrial, residential & Green building, etc.
  10. Supervision & Quality Control of Industrial building & As built Drawing work etc.