Phone: +88 02 55087611-4 Email: iwm@iwmbd.org webmail Sign In

Profile of Mohammad Ali Noor Hasan


ali

BASIC DETAILS

Name Mohammad Ali Noor Hasan
Division Survey and Data Division (SDT)
Designation Junior Specialist
Phone 880-2-55087611-4
Mobile 01521218612
Email ali@iwmbd.org


PROFILE DESCRIPTIONS

PROFILE DESCRIPTIONS

Academic Chronology

Mr. Md. Ali Noor Hasan completed his graduation in Civil Engineering from AUST, in 2017.  Currently, he is pursuing his Master's in Engineering in the Department of Water Resources Engineering, BUET. 

Professional Track Record

Mr. Md. Ali Noor Hasan started his professional career in 2017 as Lecturer in EUB till January 2019.  Then started his career as a Junior Engineer in the Survey & Data Division of the Institute of Water Modelling from January 2019. His responsibilities involved in Processing and analyzing ADCP discharge data, conducting discharge surveys and sediment collection strategies, processing single beam bathymetric survey data and topographic survey data, including run line generation and creating cross-sections and superimposing cross-sections of various seasons to compare, creating contour maps and survey maps, conducting LiDAR surveys, photogrammetry, and processing LiDAR survey data, creating orthophoto and feature maps, conducting river bank line surveys, char surveys, testing in-situ water quality parameters and comparing them with standards, field management, validating survey data, preparing final deliverables, and writing reports in accordance with project specifications.

Training/Membership/Workshop/Seminar/Publication etc.

  1. Training

 

  1. OTHER TRAINING                     :

(as trainer)

 

Training Programme for BWDB Officials on Survey Works in connection with Implementation support services for ongoing projects of BWDB. Organized by IWM in Dhaka, Jamalpur, Dalia, Satkhira, Sunamganj, Cumilla, Thakurgaon etc. BWDB offices.

Duration: 2021-2024

 

(as trainee)                              :

 

Training Workshop on Morphological and Hydrometric Data Collection

07 April – 11 April 2019; IWM conference room

 

Training Course on Computational Hydraulics, Hydrology, and Statistics for water management. Organized by DWRE, BUET.

15 Nov 2021 – 20 Jan 2022; Online platform in IWM

 

Introduction to ESIA for Young Professionals of IWM. Organized by IWM.

13 July 2024; IWM conference room

 

 

  1. Membership in professional societies: Member of IEB (M/47297)

 

  1. Research related activity

 

Thesis

    • Biochar as a green building material.

Supervised by Dr. Enamur Rahim Latifee, Associate Professor, Department of Civil Engineering, Ahsanullah University of Science and Technology.

               Date of submission: May 2017

  1. Publication
  1. Shuvo, A. R., Hasan, M. A. N., & Atiya, M. M. (2018). “Applicability of Biochar as Green Building Material”. 4th International Conference on Advances in Civil Engineering (ICACE-2018). Dept. of CE, CUET, Chittagong, Bangladesh.
  1. Islam, T., Hasan, M. A. N., & Sharmin, T. (2019). “Development of a Mathematical Model for Unsteady Flow in a Single Channel of The Karnaphuli River for Dry and Wet Season”. 2nd International Conference on Planning, Architecture and Civil Engineering (ICPACE 2019). Dept. of CE, RUET, Rajshahi, Bangladesh.

 

Major Project Assignment

  1. Integrated Hydro-Morphological Model Development and Monitoring Survey to Predict Morphological Changes in Padma River (Goalondo to Chandpur), Client: BWDB.
  2. Consultancy Services for Monitoring of Hydraulic & Morphological Conditions of Padma River for the Safety of the River Training Works of Padma Bridge, Client: BBA.
  3. Implementation Support Service in Connection with Different Ongoing Projects of Bangladesh Water Development Board, Client: BWDB.
  4. Consultant (PMC) Services for Expanded Dhaka Water Supply Resilience Project (EDWSRP), Client: DWASA.
  5. Bathymetric survey for Gorai River Dredging and Bank Protection, Client: BWDB.
  6. Hydrological Monitoring and Implementation Support service in c/w Dredging/Re-excavation of Bangali-Korotoa-Fuljhor-Hurasagar River System with Bank Protection Project of 24 Engineer Construction Brigade, Client: Bangladesh Army
  7. Survey for Feasibility study for construction of walkway, Eco-park and others on the foreshore land of the River (Buriganga, Turag, Balu and Sitalakhya River), Client: BIWTA