1 |
SDT |
Implementation Support Services in connection with different ongoing projects of BWDB during 2024-2025. |
Bangladesh Water Development Board |
2024 - 2025 |
National |
On Going |
2 |
CPI |
Feasibility Study of Improvement of Connectivity and Community Infrastructure Development in the Selected Polders of Coastal Zone of Bangladesh |
Local Government Engineering Department |
2024 - 2025 |
National |
On Going |
3 |
CCE |
Assessing climate vulnerability and risks of coastal islands and riverine char |
Department of Environment |
2024 - 2027 |
National |
On Going |
4 |
IGW |
Consultancy Service of “Greater Dhaka District Irrigation Area Development Project (4th Phase)” |
Bangladesh Agriculture Development Corporation |
2024 - 2024 |
National |
Completed |
5 |
SDT |
Consulting Services for Matarbari Port Development Project (Basin Area Survey) in People’s Republic of Bangladesh |
Consultancy |
2024 - 2024 |
National |
Completed |
6 |
IGW |
Comprehensive Study for Livelihood Improvements through Integrated Management of Land and Water Resources in Arial Beel Area |
Bangladesh Haor & Wetlands Development Board |
2024 - 2025 |
National |
On Going |
7 |
WSU |
Consultancy Services for Design and Construction Supervision under Establishment of Offsite Water Intake Facility for Rooppur Nuclear Power Plant |
Dhaka Water Supply and Sewerage Authority |
2024 - 2026 |
National |
On Going |
8 |
CPI |
Technical assessment of Tidal River Management (TRM) in the Sundarban region of Bangladesh |
The World Bank |
2024 - 2024 |
National |
Completed |
9 |
WSU |
Situational Analysis of Flood and Waterlogging Management of Sylhet City Corporation |
SNV |
2024 - 2024 |
National |
Completed |
10 |
IGW |
Hydrology Study for the Khulna Water Supply Project Phase 2 |
Asian Development Bank |
2024 - 2024 |
National |
Completed |
11 |
SDT |
Digital Topographic and Bathymetric survey along the right bank of Atai River |
Disaster Risk Management Enhancement Project (DRMEP) |
2024 - 2024 |
National |
Completed |
12 |
FRM |
Technical analysis of the Ganges flow at Farakka and Hardinge Bridge Point |
JRC |
2024 - 2024 |
National |
Completed |
13 |
IGW |
Consultancy Services for Developing Strategic Action Plan for Promotion & Adoption of Efficient Irrigation Technologies for Bangladesh and Preparing Different Training Modules |
Bangladesh Agriculture Development Corporation |
2024 - 2024 |
National |
Completed |
14 |
WSU |
Hydraulic Modelling and Detailed Design Works for Feeder Pipelines from Connection Points on Package 3.1 and Package 2 to DMA under DESWSP, Dhaka WASA |
China Geo-Engineering Corporation (CGC) |
2024 - 2025 |
National |
On Going |
15 |
RME |
HYDRO-MORPHOLOGICAL STUDIES AND RIVER TRAINING WORKS DESIGN FOR “DHAKA ELEVATED INNER CIRCULAR ROAD EASTERN BYPASS PART |
Consultant |
2024 - 2024 |
National |
Completed |
16 |
FRM |
Hydrological Impact Study of Modhu City at Taranagar, Keraniganj, Dhaka |
Dhaka |
2024 - 2024 |
National |
On Going |
17 |
IGW |
Comprehensive Study for Evaluation and Updating of Haor Master Plan |
Bangladesh Haor & Wetlands Development Board |
2024 - 2025 |
National |
On Going |
18 |
CPI |
Consultancy Services for Mongla-Ghasiakhali Canal Upgrading project- Conceptual Study in Bangladesh |
Delta Context B.V. |
2024 - 2024 |
National |
Completed |
19 |
CPI |
Securing the food systems of Asian Mega-Deltas for climate and livelihood resilience |
IWMI |
2024 - 2024 |
National |
On Going |
20 |
HRD |
Training to external Organization |
Client of this project is not decided yet |
2024 - 2024 |
National |
Completed |
21 |
CPI |
Current and projected hydrological trends in the Sundarbans mangrove forest and their impacts on ecology and ecosystem services |
CSIRO |
2024 - 2025 |
National |
On Going |
22 |
FRM |
HYDROLOGICAL STUDY AND FIELD SURVEY TO FACILITATE THE IMPLEMENTATION PLAN OF ADDITIONAL STUDY OF HFMLIP |
Bangladesh Engineering & Technology Servces |
2023 - 2024 |
National |
Completed |
23 |
ICT |
Consultancy Services for Procurement of Mauza Map Digitization and Geodatabase Creation, Barishal Division (Package-07) |
Mauza & Plot based National Digita Land Zoning Project |
2022 - 2024 |
National |
On Going |
24 |
ICT |
Package 5 (Dhaka Division) - Mauza Map Digitization and Geo database creation |
Mauza & Plot based National Digita Land Zoning Project |
2022 - 2024 |
National |
On Going |
25 |
SDT |
In house training on data processing |
IWM |
2022 - |
National |
Completed |
26 |
CPI |
Current and future state of the Ganges-Brahmaputra-Meghna delta |
- N/A - |
2022 - |
National |
Completed |
27 |
FRM |
CSIRO-AICAR: Assessing constraints & opportunities for future research into intensification of cropping systems in Southern Bangladesh |
Dhaka |
2022 - |
National |
Completed |
28 |
CPI |
CEIP-Study during Implementation |
Bangladesh Water Development Board |
2022 - |
National |
Completed |
29 |
WSU |
Preparation of RAP for Saidabad WTP Project Phase III |
Dhaka Water Supply and Sewerage Authority |
2022 - |
National |
Completed |
30 |
WSU |
Design of drainage system of 5 khals |
Dhaka Water Supply and Sewerage Authority |
2022 - |
National |
Completed |
31 |
SDT |
Multibeam Survey for Single Point Mooring Project |
- N/A - |
2022 - 2022 |
National |
Completed |
32 |
HRD |
Collaborative training & workshops with BWP |
- N/A - |
2022 - |
National |
Completed |
33 |
CPI |
Knowledge Product Multi-Sectorial Approaches to Delta Management |
- N/A - |
2022 - |
National |
Completed |
34 |
IGW |
Feasibility Study for Augmentation, Conservation and Wise Use of Surface Water Resources through Dredging of the Upstream of Teesta Barrage and Bank |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
35 |
WSU |
Modelling & DD for Water Supply Network of Aftabnagar |
None |
2022 - 2022 |
National |
Completed |
36 |
CPI |
Mathematical Model Study for Integrated Development and Sustainable Management Plan of Shahbazpur Channel of Lower Meghna River |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
37 |
FRM |
Development of a web-based cyclone surge induced inundation monitoring & local level forecasting system in polder protected areas of coastal region |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
38 |
ICT |
Sub-project for ICT-GIS division under FMG project (P-52632 |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
39 |
WSU |
Restoration of Waterbodies for Sustainable Water Management in Dhaka Watershed |
Asian Development Bank |
2022 - 2024 |
National |
Completed |
40 |
RME |
Feasibility Study for Protection of Majhir Ghat Area from Bank Erosion of Padma River in Upazila Zajira, District Shariatpur |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
41 |
RME |
Hydro-morphological study of three bridges over the Jamuna at Chilamari-Rowmari, lower Meghna at Barisla-Bhola and Meghna branch at Maya Ferry ghat |
Bangladesh Bridge Authority |
2022 - 2024 |
National |
Completed |
42 |
RME |
Hydro-morphological Study of Jamuna River at Manikganj |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
43 |
SDT |
Detailed topographic survey for proposed Bogura to SMA Station Sirajganj railway line |
RITES in JV with AARVEE Associates Architects Engineers & Consultant Pvt Ltd. |
2022 - 2024 |
National |
Completed |
44 |
ICT |
Development of Upazila Land Suitability Assessment and Crop Zoning System of Bangladesh (Phase-II) |
Bangladesh Agriculture Research Council |
2022 - 2025 |
National |
On Going |
45 |
FRM |
Feasibility Study for Developing Eco-Friendly Reservoirs for Conservation and Utilization of Excess Rainwater of Hilly Streams of Sitakund |
Bangladesh Water Development Board |
2022 - 2023 |
National |
Completed |
46 |
SDT |
Bathymetric Survey by Low frequency Echosounder |
Nippon Koei |
2022 - 2022 |
National |
Completed |
47 |
FRM |
Hydro-morphological Study for Assessing the Adequacy and Effectiveness of the Proposed Interventions |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
48 |
RME |
Feasibility Study for Protection from right bank erosion of the Padma River in Upazila Bhedarganj, District Shariatpur |
Bangladesh Water Development Board |
2022 - 2022 |
National |
Completed |
49 |
RME |
Sirajganj-Bogra Railway Line Construction - Hydro-morphological Mathematical Modelling Study |
RITES in JV with AARVEE Associates Architects Engineers & Consultant Pvt Ltd. |
2022 - 2022 |
National |
Completed |
50 |
CPI |
The selection of best suitable alignment for installation of submarine cable to connect Monpura Island with national power grid" |
West Zone Power Distribution Company Limited |
2022 - 2022 |
National |
Completed |
51 |
FRM |
Capacity Development for Enhanced Flood Forecasting and Warning Services of Bangladesh (Phase-I) |
Bangladesh Water Development Board |
2022 - 2023 |
National |
Completed |
52 |
WSU |
Study for AC Pipes Replacement in MODS Zone 1, 2, 3 & 6 under DWASA. |
Dhaka Water Supply and Sewerage Authority |
2022 - 2022 |
National |
Completed |
53 |
SDT |
Support to OTJJR for Dredging Protection Work |
JV of OTJ and JV of IHI-SMCC |
2022 - 2024 |
National |
Completed |
54 |
SDT |
Analysis of Suspended Sediment for total concentration |
JHCEC-CCECC |
2022 - 2022 |
National |
Completed |
55 |
IGW |
ESIA and ESMP Compliance and Effect Monitoring of the Sustainable Coastal and Marine Fisheries Project (SCMFP) |
Directorate of Fisheries |
2021 - 2022 |
National |
Completed |
56 |
RME |
Hydro-morphological study of the Dudhkumar River for 2nd Dudhkumar bridge at 37th km at Z-5624, Kurigram, 2020-21" |
Good |
2021 - 2022 |
National |
Completed |
57 |
RME |
Hydrology and Morphology Study for Kulaghat Bridge over Ratnai River at 7th km of Nageswari-Kashipur-Kulaghat-Lalmonirhat Regional Highway (R561) under Lalmonirhat Road Division |
Good |
2021 - 2022 |
National |
Completed |
58 |
RME |
Detailed Feasibility Study for Identifying Erosion Vulnerability and Protection of Proposed Economic Zone Construction at Bhuapur Upazilla in Tangail District |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
59 |
CPI |
Feasibility Study for Restoration and Development of Water Resource Management System of Kutubdia and Matarbari Island |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
60 |
FRM |
Expansion flood forecasting model & Improve inundation model in coastal and hotspot areas |
Bangladesh Water Development Board |
2021 - 2024 |
National |
Completed |
61 |
RME |
Chandpur Town Protection Works |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
62 |
SDT |
Water level measurement in the Pussur & Shibsa System during December 2021 |
JHCEC-CCECC |
2021 - 2022 |
National |
Completed |
63 |
WSU |
Project Mgt & Cons Supervision of Khulna Sewerage System Development Project |
Khulna WASA |
2021 - 2024 |
National |
On Going |
64 |
RME |
Hydro-Morphological Study of the Meghna River for technical feasibility of the bridges at Gazaria-Munshiganj and at Shariatpur-Chandpur Road |
None |
2021 - 2024 |
National |
On Going |
65 |
RME |
Hydro-Morphological Study of 120 meter long Bridge at Meghna Economic Zone connecting road under Road Division Narayangonj during the year 2020-2021 |
Good |
2021 - 2022 |
National |
Completed |
66 |
RME |
Hydro-Morphological Study of 180 meter long Bridge along with approach road at Cumilla Economic Zone connecting road under Road Division Narayangonj during the year 2020-2021 |
Good |
2021 - 2022 |
National |
Completed |
67 |
CPI |
Feasibility Study for Flood and Erosion Management of the Sheikh Hasina Cantonment |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
68 |
SDT |
Bathymetric Survey of the Padma River at Rajbari |
Bangladesh Water Development Board |
2021 - 2021 |
National |
Completed |
69 |
CPI |
Preparation of Draft DPP including Feasibility Study for Upgradation of CDDL by constructing second Dry Dock including associated Shipbuilding Infrastructure project |
Chittagong Dry Doc Ltd. |
2021 - 2022 |
National |
Completed |
70 |
SDT |
Sediment Sampling and Analysis in connection with Mongla Port Dredging Work |
China Harbour |
2021 - 2021 |
National |
Completed |
71 |
SDT |
Support to IHI for dredging and revetment works |
Dhaka |
2021 - 2022 |
National |
Completed |
72 |
SDT |
Survey works related to Disaster Risk Management Enhancement Project (DRMEP) |
Dhaka |
2021 - 2021 |
National |
Completed |
73 |
CPI |
Re-location of Existing Private Dockyards from the Bank of Buriganaga and Development of a Plan for Standard Dockyards Zone |
BanglaDesh Inter-water Transport Authority |
2021 - 2022 |
National |
Completed |
74 |
SDT |
Analysis of water sample in connection with Payra Port Dredging Work |
Jan De Nul NV, Belgium |
2021 - 2022 |
National |
Completed |
75 |
RME |
Mathematical Modelling Study for Selection of Two Intake Point locations on Padma River banks near Hardinge Bridge |
NJS Ltd & Aqua Consultant |
2021 - 2022 |
National |
Completed |
76 |
IGW |
Updating Feasibility Study for Kurigram Irrigation Project (North and South Unit) |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
77 |
IGW |
Mathematical Modelling Study for Rehabilitation of Barisal Irrigation Project (BIP) |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
78 |
RME |
Feasibility Study and Detail Design for Construction of Large Bridges on upazilla, Union & Village Road Project (FSB)-LBSP-2 |
Local Government Engineering Department |
2021 - 2022 |
National |
Completed |
79 |
SDT |
Bathymetric Survey of the Halda River for 20ECB |
Bangladesh Army |
2021 - 2021 |
National |
Completed |
80 |
WSU |
Supervision works for Test /Production Tubewell & Aquifer Test, Topographic survey and Data collections in Purbachol area |
- N/A - |
2021 - 2022 |
National |
Completed |
81 |
SDT |
Bathymetric Survey of the Halda River for BWDB |
Bangladesh Water Development Board |
2021 - 2021 |
National |
Completed |
82 |
FRM |
Supporting tasks for MOWR/BWDB Technical Committee related to FMG |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
83 |
SDT |
JDN Payra Port soil Sample Analysis |
Jan De Nul NV, Belgium |
2021 - 2024 |
National |
On Going |
84 |
RME |
Mathematical modelling study for selection of an Intake Point location in the left branch of Meghna & Dhonagoda River |
Department of Public Health |
2021 - 2022 |
National |
Completed |
85 |
FRM |
Feasibility Study for Drainage Improvement in Uttara Sector 2, 4, 6 & 8 under Dhaka North City Corporation |
Dhaka North City Corporation |
2021 - 2021 |
National |
Completed |
86 |
SDT |
Multibeam Bathymetric Survey of the Padma River at Naria |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
87 |
SDT |
Implementation support service to BWDB Taskforce during 2021-22 |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
88 |
RME |
Mathematical modeling study for sustainable management of the Gorai River basin including offtake |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
89 |
FRM |
Data Collection and Regional Model Validation for 2020 |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
90 |
RME |
Hydrological and Morphological Study for Construction of 5.6 km Naradaha-Khaschar Link Road including Two Bridges at Naradaha and Khaschar under Pabna Road Division |
Good |
2021 - 2022 |
National |
Completed |
91 |
SDT |
Dredging/Re-Excavation of Bangali-Karotoa-Fuljor-Hurasagor River System with Bank Protection Project |
Bangladesh Army |
2021 - 2023 |
National |
Completed |
92 |
RME |
MORPHOLOGICAL STUDY OF THE PADMA RIVER FOR THE POSITION OF FOUR TOWERS OF THE 230KV BHERAMARA HVDC-ISWARDI TRANSMISSION LINE UNDER PGCB, ISWARDI |
Power Grid Company of Bangladesh Ltd. (PGCB) |
2021 - 2021 |
National |
Completed |
93 |
SDT |
Bathymetric Survey in the Sangu River and cross section /topographic survey along Painchara, a tributary of the Sangu River in the nearby areas of Bandarban District Town |
NJS Ltd & Aqua Consultant |
2021 - 2021 |
National |
Completed |
94 |
RME |
Hydrology & Morphological Study of Ichamoti River For Construction of Kunderbazar Bridge at 6th km. (Ch. 5+570) of Munshigonj (Hatimara)-Kunderbazar-Sreenagar (Sanbari) during the Year 2020-2021 |
Good |
2021 - 2022 |
National |
Completed |
95 |
CPI |
Hydro-morphological Model Study and Strategic Planning for Char Development in the Meghna Estuary under CDSP Project phase IV-B(AF) |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
96 |
CPI |
DETAILED HYDROLOGICAL AND MORPHOLOGICAL SURVEY AND STUDY FOR MATARBARI PORT DEVELOPMENT PROJECT (RHD COMPONENT) |
Oriental Consultants Global Co. Ltd. |
2021 - 2021 |
National |
Completed |
97 |
FRM |
Flash Flood Early Warning System for North-Eastern Part of Bangladesh, Extended Project |
Bangladesh Water Development Board |
2021 - 2021 |
National |
Completed |
98 |
RME |
Hydro-morphological Survey and Investigation of the Padma/Ganges River in Connection with Land Reclamation in the Padma River adjacent to the Rajshahi City Corporation Area |
Rajshahi City Corporation |
2021 - 2021 |
National |
Completed |
99 |
SDT |
Topographic Survey for Matarbari Port |
Nippon Koei |
2021 - 2021 |
National |
Completed |
100 |
RME |
Hydro-Morphological Study of proposed 2nd Monu Bridge at road N-207, RHD, Moulvibazar |
Good |
2021 - 2021 |
National |
Completed |
101 |
RME |
Hydro-Morphological Study of Proposed Bridge over the Kushiyara River at (Z-2017) Road, RHD, Moulvibazar |
Good |
2021 - 2021 |
National |
Completed |
102 |
IGW |
Consultancy Services for Participatory Rural Appraisal (PRA) and Baseline Study of the State of Water Resources in the High Barind Region |
WARPO |
2021 - 2022 |
National |
Completed |
103 |
WSU |
Construction Supervision of Roads & Drains for Zone 01 to 05 under GCC 2nd Phase |
Gazipur City Corporation |
2021 - 2022 |
National |
Completed |
104 |
WSU |
Independent engineer services fort the development of water distribution and supply facilities at Purbachal new town project through public private partnership |
Rajdhani Unnyan Kortripaksha |
2021 - 2025 |
National |
On Going |
105 |
SDT |
Topographic Survey for Matarbari LNG Project |
Nippon Koei |
2021 - 2021 |
National |
Completed |
106 |
SDT |
Survey, data collection and processing for Installation and maintenance of water gauges |
Bangladesh Water Development Board |
2021 - 2022 |
National |
Completed |
107 |
RME |
Darshana-Meherpur Rail Line - Hydro-morphological Study |
SMEC |
2021 - 2021 |
National |
Completed |
108 |
IGW |
Study for Hydrological Investigation & Modelling of the State of Surface Water and Groundwater Resources in the High Barind Region |
WARPO |
2021 - 2023 |
National |
Completed |
109 |
WSU |
Master Plan on Meghna River Pollution Control, Navigability Increase and Ensuring Riverbank Stability |
Dhaka Water Supply and Sewerage Authority |
2021 - 2022 |
National |
Completed |
110 |
ICT |
Site Specific Plan (SSP) and ODK Development for SUFAL Project |
Bangladesh Forest Department |
2021 - 2021 |
National |
Completed |
111 |
SDT |
Support to CEIP 1 |
DHV |
2021 - 2021 |
National |
Completed |
112 |
WSU |
Design Review and Construction Supervision of Mirersharai WTP |
Bangladesh Economic Zone Authority |
2021 - 2024 |
National |
On Going |
113 |
CPI |
Water Management knowledge and Innovation Program (WMKIP)-2021 |
Stichting Deltares |
2021 - 2021 |
National |
Completed |
114 |
RME |
Different River Crossing (Padma, Payra, Sugandha) for Infrastructure Development of Payra-Gopalgonj-Aminbazar 2nd 400kV Double Circuit Transmission line |
Bangladesh-China Power Company (pvt.) limited |
2020 - 2021 |
National |
Completed |
115 |
WSU |
Water Assessment of BATB factories at Dhaka and Kushtia |
None |
2020 - 2021 |
National |
Completed |
116 |
SDT |
Survey work at Paturia & Daulatdia |
BanglaDesh Inter-water Transport Authority |
2020 - 2021 |
National |
Completed |
117 |
WSU |
ESIA and RAP of Japanese EZ in Araihazar |
Bangladesh Economic Zone Authority |
2020 - 2021 |
National |
Completed |
118 |
WSU |
Detailed Design & Construction Supervision of Water Supply Network under Tetulzhora-Bhakurta Well Field Project Area |
Dhaka Water Supply and Sewerage Authority |
2020 - 2022 |
National |
Completed |
119 |
CCE |
Understanding the Sea Level Rise Dynamics of Bangladesh along the Coast |
Met Office |
2020 - 2022 |
National |
Completed |
120 |
RME |
Four Border Rivers of the NE Region - Hydro-morphological Study |
Good |
2020 - 2021 |
National |
Completed |
121 |
RME |
Kangsha Bridge on the Kangsha River - Hydro-morphological Study |
Good |
2020 - 2021 |
National |
Completed |
122 |
FRM |
JICA preparatory survey for Urban Development |
Dhaka |
2020 - 2021 |
National |
Completed |
123 |
RME |
Hydrological & Morphological Survey and 2D Hydrodynamic and Morphological Modelling for Construction of Bangabandhu Sheikh Mujib Railway Bridge |
JV of OTJ and JV of IHI-SMCC |
2020 - 2025 |
National |
On Going |
124 |
CPI |
Pathway of scaling agriculture innovations for sustainable intensification in polders of Coastal Bangladesh |
International Rice Research Institute |
2020 - 2023 |
National |
Completed |
125 |
FRM |
Updating and Maintenance of FFWS of FFWC |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
126 |
SDT |
Bathymetric Survey for Gorai River Bank Protection & Dredging Work |
Bangladesh Water Development Board |
2020 - 2022 |
National |
Completed |
127 |
FRM |
Feasibility Study for Re-excavation of New Dakatia River in Cumilla and Chandpur District |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
128 |
CPI |
Development of Ferry Ghats at Sariakandi, Bogura and Madarganj, Jamalpur for introducing ferry service between those place |
BanglaDesh Inter-water Transport Authority |
2020 - 2022 |
National |
Completed |
129 |
CPI |
Assessment of Storm Surge, Cyclone and Flood Forecasting in Bangladesh and Recommendation to Improve Forecasting for Decision-Making |
CDR International B.V. |
2020 - 2020 |
National |
Completed |
130 |
WSU |
WQ Assessment under Shuvadya Khal Feasibility Study |
Bangladesh Water Development Board |
2020 - 2020 |
National |
Completed |
131 |
RME |
Rahmatpur Bridge on the Old Brahmaputra River - Hydro-morphological Study |
Good |
2020 - 2020 |
National |
Completed |
132 |
RME |
Morphological Study of the Jamuna for River Crossing of Power Transmission Line |
Power Grid Company of Bangladesh Ltd. (PGCB) |
2020 - 2021 |
National |
Completed |
133 |
CPI |
Hydro-morphological Mathematical Modelling Study for Re-excavation of 83 Rivers/khals and Increase Navigation of Mongla-Ghasiakhali Channel in Bagerhat district |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
134 |
RME |
Morphological Survey of Different River Crossing (Padma and Jamuna) for Infrastructure Development for power Evacuation facilities of Rooppur Nuclear power plant |
Power Grid Company of Bangladesh Ltd. (PGCB) |
2020 - 2021 |
National |
Completed |
135 |
FRM |
Feasibility Study for Re-excavation of Shuvadya Khal along with Development and Protection of its both Banks. |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
136 |
WSU |
Design and modelling for ICB 2.10 under DWSNIP |
Dhaka Water Supply and Sewerage Authority |
2020 - 2023 |
National |
Completed |
137 |
SDT |
Hydromorphological Survey for Land Reclamation (CDSP-III) |
CDSP |
2020 - 2021 |
National |
Completed |
138 |
SDT |
Bathymetric survey at Lower Meghna |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
139 |
RME |
Padma Bridge Modelling |
Dhaka |
2020 - 2021 |
National |
Completed |
140 |
RME |
3 New Rail Line, and a New Rail Bridge over the Teesta River - Hydro-morphological Study |
Bangladesh Railway |
2020 - 2021 |
National |
Completed |
141 |
RME |
Shikirhat Bridge on the Bhairab River - Hydro-morphological Study |
Good |
2020 - 2020 |
National |
Completed |
142 |
SDT |
Implementation support support service to BWDB Taskforce |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
143 |
FRM |
Regional Models Validation for 2019 |
IWM |
2020 - 2021 |
National |
Completed |
144 |
SDT |
Multibeam Echosounder Survey at Naria |
Bangladesh Water Development Board |
2020 - 2021 |
National |
Completed |
145 |
RME |
Shuvapur Bridge on the Feni River - Hydro-morphological Study |
Good |
2020 - 2020 |
National |
Completed |
146 |
SDT |
Support to WUR in Research Project "Deltas Out of Shape" |
WSP |
2020 - 2021 |
National |
Completed |
147 |
ICT |
Developing Disaster and Climate Change Risk Profile of Industry Sector in Bangladesh |
UNDP |
2020 - 2021 |
National |
Completed |
148 |
SDT |
Survey of proposed Landing station & Vessel Shelter for BIWTA |
Design Development & Construction |
2020 - 2021 |
National |
Completed |
149 |
SDT |
Multibeam Echosounder Survey at Payra Power Plant |
Dhaka |
2020 - 2020 |
National |
Completed |
150 |
SDT |
Providing input of Hydrologist to Nippon Koei in South Chattogram Project |
Dhaka |
2020 - 2021 |
National |
Completed |
151 |
ICT |
Preparation of GIS Maps (City & Ward) for Chattogram City Corporation (CCC). |
Chattogram City Corporation |
2020 - 2022 |
National |
Completed |
152 |
SDT |
JICA Basic Data Collection and Monitoring of River Water |
Dhaka |
2020 - 2021 |
National |
Completed |
153 |
IGW |
Groundwater Hydrological Study for the proposed Project of "Probable Site Selection for Construction of Nuclear Power Plant in the Southern Part of Bangladesh" |
Bangladesh Atomic Energy Comission |
2020 - 2020 |
National |
Completed |
154 |
CPI |
Water Management Knowledge and Innovation Program 2020 |
Stichting Deltares |
2020 - 2020 |
National |
Completed |
155 |
SDT |
Discharge Measurement for Kohelia River |
Dhaka |
2020 - 2020 |
National |
Completed |
156 |
SDT |
Survey support to Mitamoin Cantonment Project |
Bangladesh Army |
2019 - 2024 |
National |
Completed |
157 |
WSU |
Feasibility Study in connection with Preparation of DPP for Construction and Rehabilitation of DTW in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2019 - 2020 |
National |
Completed |
158 |
SDT |
Met Ocean survey for Payra Port |
Bangladesh University of Engineering & Technology |
2019 - 2020 |
National |
Completed |
159 |
FRM |
Feasibility Study for Flood Control, Drainage, Irrigation and Dredging of Bakkhali River in Cox's bazar District |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
160 |
RME |
Mathematical Modelling Study for Bridges along the Nasirnagar R&H-Bholakot Bazar-Chatalpara GC-Aruail Road |
Local Government Engineering Department |
2019 - 2020 |
National |
Completed |
161 |
CPI |
Feasibility Study for the Development and Management of Karnafuli River Basin (with Halda river) |
Bangladesh Water Development Board |
2019 - 2021 |
National |
Completed |
162 |
CPI |
Surface Water Hydrological Study for Selection of Potential Locations for Nuclear Power Plant in Southern Region of Bangladesh |
Bangladesh Atomic Energy Comission |
2019 - 2020 |
National |
Completed |
163 |
CPI |
Feasibility Study for Protection and Development of Kuakata Sea Beach |
Bangladesh Water Development Board |
2019 - 2021 |
National |
Completed |
164 |
IGW |
Comprehensive Feasibility Study for Sustainable Restoration and Protection of Wetlands (Haor, baor, beel and connected rivers etc.) in Different Hydrological Regions of Bangladesh |
Bangladesh Haor & Wetlands Development Board |
2019 - 2021 |
National |
Completed |
165 |
CPI |
Developing Concept Design Solution for Coastal Erosion in Bangladesh |
CDR International B.V. |
2019 - 2020 |
National |
Completed |
166 |
ICT |
Sub Project of GIS and Mapping Support for DWSNIP of DWASA (Main project of P52146 of WRP |
SA Engineering |
2019 - 2022 |
National |
Completed |
167 |
CPI |
Feasibility Study for Protection and Development of Cox's Bazar Sea Beach |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
168 |
WSU |
Emergency Multi-Sector Rohingya Crisis Response Project (EMCRP) |
Department of Public Health |
2019 - 2022 |
National |
Completed |
169 |
CPI |
Feasibility Study for Restoration of Sangu and Matamuhuri River Basin |
Bangladesh Water Development Board |
2019 - 2021 |
National |
Completed |
170 |
WSU |
ESIA and ESMF for the PRIDE Project, Mirersharai |
Bangladesh Economic Zone Authority |
2019 - 2022 |
National |
Completed |
171 |
SDT |
Emergency Bathymetric Survey of lower Meghna river at Char Folkon in Upazila : Komolnagar, District : Lakshmipur |
Bangladesh Water Development Board |
2019 - 2019 |
National |
Completed |
172 |
SDT |
Bathymetric Survey by Multibeam Echosounder for monitoring Bank erosion and River training works at Noria. |
Bangladesh Water Development Board |
2019 - 2019 |
National |
Completed |
173 |
RME |
Mathematical Modelling for New Rail Line from Modhukhali to Magura |
Bangladesh Railway |
2019 - 2020 |
National |
Completed |
174 |
SDT |
Bathymetric survey and Discharge measurement during 2019 monsoon for FRERMIP |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
175 |
FRM |
Feasibility Study for Construction of Hydraulic Elevated Dam of BWDB |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
176 |
WSU |
Water Supply from Mohra to Mirersharai EZ |
Chittagong WASA |
2019 - 2021 |
National |
Completed |
177 |
ICT |
Consultancy Services for Updating the Resettlement Action Plan (RAP) and Development of an IT System for Improvement of Sylhet-Tamabil Road |
Good |
2019 - 2019 |
National |
Completed |
178 |
FRM |
MIKE HYDRO Basin Model Updating for Water Allocation Plan Study for Selangor State |
JPS Consultant, Malaysia |
2019 - 2019 |
National |
Completed |
179 |
WSU |
Plan Design & Supervision of Maritime University |
Bangabandhu Sheikh Mujibur Rahman Maritime University |
2019 - 2023 |
National |
Completed |
180 |
SDT |
Implementation Support Services in connection with different ongoing projects of BWDB |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
181 |
FRM |
Regional Models Updating and Validation for 2018 |
IWM |
2019 - 2020 |
National |
Completed |
182 |
RME |
Mathematical Modelling for Dredging of the Padma River in Dohar Upazilla |
Bangladesh Army |
2019 - 2021 |
National |
Completed |
183 |
RME |
Hydro-morphological Modelling for the Buriganga & Meghna Rivers - Container Terminals at Pangaon and Ashuganj |
Design Development & Construction |
2019 - 2019 |
National |
Completed |
184 |
CPI |
Feasibility Study of Hilly Rivers for Integrated Solutions |
BanglaDesh Inter-water Transport Authority |
2019 - 2020 |
National |
Completed |
185 |
CPI |
Feasibility Study for Establishing the Linkage of the Upper Bhairab River with Mathabanga River for Restoration of Dry Season Flow |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
186 |
CCE |
Groundwater Rejuvenation As Climate change Resilience for marginalized and gender sensitive Ganges (GRACERS) |
International Institute |
2019 - 2021 |
International |
Completed |
187 |
DED, Opn |
Design vetting of 10 nos. of sluice gate and road embankment under the project "Construction of road from Kalurghat to Chaktai khal along the bank of Karnaphuly river by CDA |
Chittagong Development Authority |
2019 - 2019 |
National |
Completed |
188 |
WSU |
Consultancy Services for pre-work and post-work survey and analysis of 5-khals under Dhaka WASA |
Dhaka Water Supply and Sewerage Authority |
2019 - 2020 |
National |
Completed |
189 |
CPI |
Development of Cox's Bazar Airport - Additional Hydrological and Morphological Study for the further extension of Cox's Bazar |
Civil Aviation Authority of Bangladesh |
2019 - 2019 |
National |
Completed |
190 |
CPI |
Support to the Implementation of the Bangladesh Delta Plan 2100. |
Twynsta Gudde |
2019 - 2022 |
National |
Completed |
191 |
CPI |
Supervision and Monitoring the Performance of Dredging, Morphological and Environmental Impacts, Detailed Design and Assessment of Effectiveness of Dredging |
BanglaDesh Inter-water Transport Authority |
2019 - 2025 |
National |
On Going |
192 |
WSU |
Road and drainage improvement in zone 1-5 of GCC |
Gazipur City Corporation |
2019 - 2022 |
National |
Completed |
193 |
WSU |
Pre and Post-work Measurement for Sludge Removal of 11 khals in Dhaka city |
Dhaka Water Supply and Sewerage Authority |
2019 - 2019 |
National |
Completed |
194 |
WSU |
Sabrang/ Naf tourism park water assessment |
Bangladesh Economic Zone Authority |
2019 - 2021 |
National |
Completed |
195 |
SDT |
Bathymetric Survey at Bangladesh Magnama CCPP Project |
None |
2019 - 2019 |
National |
Completed |
196 |
IGW |
Groundwater-Surface Water Interaction Modelling and Hydrogeological Investigation for Conversion of 150 MW Sylhet GT to 225 MW CCPP Project |
Shanghai Electric Group Co. Ltd |
2019 - 2019 |
National |
Completed |
197 |
CPI |
Mathematical Model Study for Integrated Development and Sustainable Management Plan of Lower Meghna River Along Bhola Island |
Bangladesh Water Development Board |
2019 - 2020 |
National |
Completed |
198 |
WSU |
Integrated WRM in Bangladesh - TA |
The World Bank |
2019 - 2019 |
National |
Completed |
199 |
CPI |
Mathematical Model Study for Integrated Development and Sustainable Water Management of Tentulia River |
Bangladesh Water Development Board |
2019 - 2019 |
National |
Completed |
200 |
WSU |
Project Pre-feasibility study of Netrokona EZ |
Bangladesh Economic Zone Authority |
2019 - 2020 |
National |
Completed |
201 |
RME |
Bahadurpur and Kernal Khal Bridges - Hydro-morphological Study |
Good |
2019 - 2019 |
National |
Completed |
202 |
CPI |
Joint Cooperation Programme for Bangladesh |
Stichting Deltares |
2019 - 2022 |
National |
Completed |
203 |
RME |
Monitoring of the Jamuna River for the Safety of RTWs of Bangabandhu Bridge during 2018 to 2022 |
Bangladesh Bridge Authority |
2019 - 2024 |
National |
Completed |
204 |
WSU |
Training, GIS Data Preparation & Mapping, Prepare Survey Report, Modelling and Detailed Design for the Contract Package ICB 02.9 of DWSNIP |
SA Engineering |
2019 - 2022 |
National |
Completed |
205 |
WSU |
Drainage Study of Chinese Economic Zone |
China Harbour |
2019 - 2019 |
National |
Completed |
206 |
CPI |
Water Management Knowledge and Innovation Program 2019 |
Stichting Deltares |
2019 - 2019 |
National |
Completed |
207 |
WSU |
Updating of FS of Singair Phase 2 |
Dhaka Water Supply and Sewerage Authority |
2019 - 2019 |
National |
Completed |
208 |
RME |
Munshirhat Bridge on the Kirtinasha River - Hydro-morphological Study |
Good |
2018 - 2019 |
National |
Completed |
209 |
SDT |
Prework survey for landfilling work at Sirajganj |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
210 |
FRM |
Support to SIBDP-2100 (CPE) |
Gazipur City Corporation |
2018 - 2022 |
National |
Completed |
211 |
WSU |
Design and supervisn of drainage system in Zone 1 & 2 in Dhaka city |
Dhaka Water Supply and Sewerage Authority |
2018 - 2021 |
National |
Completed |
212 |
FRM |
Data collection and updating of Regional Models for 2017 |
IWM |
2018 - 2019 |
National |
Completed |
213 |
IGW |
Aquifer Mapping and Groundwater Resource Assessment using Mathematical Modelling Technique |
Bangladesh Agriculture Development Corporation |
2018 - 2020 |
National |
Completed |
214 |
WSU |
Hydrogeological Investigation and Groundwater Modelling for Assessment of Groundwater Resources at Sirajganj Power Plant Area |
SDCI (Bangladesh) Limited |
2018 - 2018 |
National |
Completed |
215 |
CPI |
Feasibility study for construction of walkway, Eco-park and others on the foreshore land of the river Buriganga, Turag, Balu and Sitalakhya |
BanglaDesh Inter-water Transport Authority |
2018 - 2019 |
National |
Completed |
216 |
SDT |
Bathymetric Survey for Gorai River Dredging and Bank Protection |
Bangladesh Water Development Board |
2018 - 2020 |
National |
Completed |
217 |
WSU |
ADB-PDF |
Dhaka Water Supply and Sewerage Authority |
2018 - 2022 |
National |
Completed |
218 |
CPI |
Long Term Monitoring, Research and Analysis of Bangladesh Coastal Zone |
Bangladesh Water Development Board |
2018 - 2022 |
National |
Completed |
219 |
ICT |
GIS based Interactive Election Assessment System (GIEAS) |
A2I PMO |
2018 - 2019 |
National |
Completed |
220 |
SDT |
Survey Support for Kutubdia Energy Hub |
Jan De Nul NV, Belgium |
2018 - 2019 |
National |
Completed |
221 |
CCE |
Groundwater Resource Assessment and Impact of Climate Change in Coastal area |
Danish Hydraulic Institute |
2018 - 2021 |
National |
Completed |
222 |
ICT |
Development of Web-GIS Application Phase-III for BTRC |
Bangladesh Telecommunication Regulatory Commission |
2018 - 2019 |
National |
Completed |
223 |
WSU |
Pagla STP Supervision Project |
Dhaka Water Supply and Sewerage Authority |
2018 - 2022 |
National |
Completed |
224 |
RME |
Dhaka-Chittagong High-speed Railway Line - Hydro-morphological Study |
CRDC-Mazumder Enterprise Consortium |
2018 - 2019 |
National |
Completed |
225 |
ICT |
Development of Upazila Land Suitability Assessment and Crop Zoning System of Bangladesh |
Bangladesh Agriculture Research Council |
2018 - 2021 |
National |
Completed |
226 |
SDT |
Site Survey for Selection of Hydrometric Station |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
227 |
WSU |
TA for Detailed Design, Development of Service Option & Modality and Preparation of Detailed Project Report (DPR) of Water Supply Scheme to Implement in Thirty Towns of Bangladesh |
Department of Public Health |
2018 - 2019 |
National |
Completed |
228 |
FRM |
Modelling Study and Statistical Analysis for Determination of Hydrological Parameters at Selected Locations on the Rivers |
SMEC |
2018 - 2018 |
National |
Completed |
229 |
SDT |
Implementation Support Service in connection with different ongoing projects of BWDB during 2018-19 |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
230 |
WSU |
Land use Master Plan for DSCC New Unions |
Dhaka South City Corporation |
2018 - 2019 |
National |
Completed |
231 |
SDT |
Kutubdia Energy Hub-Bathymetric and Met Ocean Monitoring Survey |
HASKONING |
2018 - 2019 |
National |
Completed |
232 |
WSU |
Preparation of Detail Design with BOQ of 17 Bridges in Demra, Dakhingaon, Nasirabad & Manda Union of DSCC |
Dhaka South City Corporation |
2018 - 2018 |
National |
Completed |
233 |
WSU |
FS of Collection System of Dasherkandi STP |
Dhaka Water Supply and Sewerage Authority |
2018 - 2019 |
National |
Completed |
234 |
CPI |
Technical FS of Boro Char in the Meghna River at Ikhlaspur Union under Matlab North Upazila in Chandpur District |
Bangladesh Agriculture Development Corporation |
2018 - 2018 |
National |
Completed |
235 |
CPI |
River Modelling Study for Assessing the Impact of Slipway and Planning of Mitigation Measures |
Khulna Shipyard Limited |
2018 - 2018 |
National |
Completed |
236 |
RME |
Hydro-morphological Modelling and Survey of the Jamuna River for the Proposed Bangabandhu Rail Bridge |
JV of OCG-Chodai-DDC |
2018 - 2020 |
National |
Completed |
237 |
FRM |
Promoting Resilience through Index Insurance in Bangladesh |
OXFAM, GB |
2018 - 2018 |
National |
Completed |
238 |
WSU |
Consultancy Services for Pre and Post-work Measurement after Sludge Removal and Re-excavation of Selected Khals in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2018 - 2018 |
National |
Completed |
239 |
WSU |
Sewerage master plan and detail design of priority works in Sylhet City |
Sylhet City Corporation |
2018 - 2022 |
National |
Completed |
240 |
CPI |
Payra Port Capital Dredging - Technical Consultancy Support Services |
Payra Port Authority |
2018 - 2018 |
National |
Completed |
241 |
RME |
Mirgonj and Nehalgonj Bridges over the Arialkha River - Hydro-morphological Study |
Good |
2018 - 2018 |
National |
Completed |
242 |
CPI |
FS of port facilities for Khulna, Narsingdi, Barguna , Galachipa, Mongla, Meghna, Sunamganj, Tekerghat, Ghorashal, Kanchpur port, Mojuchowdhuryhat, Daudkandi-Bausia River Port |
Bangladesh Petroleum Corporation |
2018 - 2019 |
National |
Completed |
243 |
RME |
Bhanga to Payra Port Rail Line Construction - Hydro-morphological Study |
Bangladesh Railway |
2018 - 2021 |
National |
Completed |
244 |
SDT |
Collection of bed sample and grain size analysis for JDN |
Jan De Nul NV, Belgium |
2018 - 2018 |
National |
Completed |
245 |
WSU |
Environmental Assessment of DSIP |
Dhaka Water Supply and Sewerage Authority |
2018 - 2019 |
National |
Completed |
246 |
WSU |
Water Resource Potential Assessment of Ukhia and Teknaf Upazila Area, Cox's Bazar, Bangladesh |
WaterAid |
2018 - 2018 |
National |
Completed |
247 |
SDT |
Bathymetric Survey, Current and Sediment Measurement for Free FEED Project (Payra Part) |
Nippon Koei |
2018 - 2018 |
National |
Completed |
248 |
FRM |
Flood Management Planning in Bangladesh: Cooperation on Mathematical Model of Hydrology and Sediment |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
249 |
RME |
Premtala Bridge over Kirtinasha River and Kazirhat Bridge over branch of Arial Khan River - Hydro-morphological Study |
Good |
2018 - 2018 |
National |
Completed |
250 |
SDT |
Sitakunda Port - Surveys |
Design Development & Construction |
2018 - 2018 |
National |
Completed |
251 |
CPI |
Technical Feasibility Study of Embankment-cum-road and Water Management Systems for Economic Zone-4 at Sonadia-Ghotibhanga Islands, Moheskhali, Cox's Bazar |
Bangladesh Water Development Board |
2018 - 2019 |
National |
Completed |
252 |
WSU |
Feasibility Study of Development of Safe Water Supply System in the newly added 16 unions of DNCC and DSCC |
Dhaka Water Supply and Sewerage Authority |
2018 - 2018 |
National |
Completed |
253 |
SDT |
Post work Hydrographic Survey for RTIP-II |
None |
2018 - 2018 |
National |
Completed |
254 |
WSU |
Water Availability & Demand Assessment of MICITY |
Bangladesh Economic Zone Authority |
2018 - 2020 |
National |
Completed |
255 |
FRM |
Mathematical Modeling & Survey Support for HFM&LIP during 2018 & 2019 |
Nippon Koei |
2018 - 2020 |
National |
Completed |
256 |
CPI |
Water Management Knowledge and Innovation Program (WMKIP) |
Stichting Deltares |
2018 - 2019 |
National |
Completed |
257 |
FRM |
Prediction of Vulnerable Reaches of Submersible Embankment for Erosion due to Wave in 14 no new Haor subprojects |
Nippon Koei |
2017 - 2018 |
National |
Completed |
258 |
SDT |
Bathymetric Survey and Bed material analysis for Matarbari Port Development Project |
Nippon Koei |
2017 - 2018 |
National |
Completed |
259 |
SDT |
Survey for Feasibility Study and Pre-FEED for Petrobangla LNG Terminal Project |
Nippon Koei |
2017 - 2018 |
National |
Completed |
260 |
SDT |
River Survey, Lower Bhadra, Khulna during November 2017 |
Blue Gold Program |
2017 - 2017 |
National |
Completed |
261 |
FRM |
Management Support to the Mathematical Modelling Centre (MMC) for Water Resources Research & Development under Water Resources Department, Government of Bihar |
Joint Venture |
2017 - 2024 |
National |
Completed |
262 |
SDT |
Implementation Support Services in Connection with different ongoing projects of BWDB |
Bangladesh Water Development Board |
2017 - 2018 |
National |
Completed |
263 |
SPB |
Urbanizing Deltas of the World (UDW) Workshop 2017 |
Netherlands Organisation for Scientific Research |
2017 - 2018 |
National |
Completed |
264 |
IGW |
Training on Development of Groundwater Model for Linggi River Basin using MIKE SHE |
NAHRIM |
2017 - 2017 |
National |
Completed |
265 |
WSU |
Groundwater study at Purbachal New Town Project |
The World Bank |
2017 - 2018 |
National |
Completed |
266 |
FRM |
Flood and Drainage Management Study at BSRM Plots, Mirsharai Chittagong |
None |
2017 - 2018 |
National |
Completed |
267 |
FRM |
Hydrological Study for a Water Reservoir Construction to Supply Water to the GPH Ispat Limited, Kumira, Sitakunda, Chittagong |
None |
2017 - 2018 |
National |
Completed |
268 |
ICT |
Development of Web-GIS Application Phase-II for BTRC |
Bangladesh Telecommunication Regulatory Commission |
2017 - 2018 |
National |
Completed |
269 |
WSU |
Review the technical design of water supply systems / service options for Municipal Towns of Bangladesh |
The World Bank |
2017 - 2017 |
National |
Completed |
270 |
RME |
Four Large Road Bridges in the SW Region of Bangladesh - Hydro-morphological Study |
International Institute |
2017 - 2018 |
International |
Completed |
271 |
FRM |
Collaboration between IWM and Tufts University, USA on Flood Forecasting |
None |
2017 - 2020 |
National |
Completed |
272 |
FRM |
Data Collection and Regional Models Updating for 2016-18 |
- N/A - |
2017 - 2018 |
National |
Completed |
273 |
WSU |
Consultancy Services for demarcation of RoW of raw water transmission pipeline of Saidabad WTP Phase III |
Dhaka Water Supply and Sewerage Authority |
2017 - 2018 |
National |
Completed |
274 |
WSU |
Design of water distribution system in Zilmil project area |
Dhaka Water Supply and Sewerage Authority |
2017 - 2022 |
National |
Completed |
275 |
CPI |
Feasibility Study for Restoration of Bhadra and Salta river along with adjacent polder (25, 26, 27/1, 27/2, 28/1 & 29) to removal of Drainage Congestion of Khulna District including ESIA) |
Bangladesh Water Development Board |
2017 - 2018 |
National |
Completed |
276 |
CPI |
Feasibility study for restoration of dry season flow through dredging in the Sangu, Matamuhuri and Kornofuli River for improvement of navigability, domestic water use and irrigation |
BanglaDesh Inter-water Transport Authority |
2017 - 2018 |
National |
Completed |
277 |
CPI |
Feasibility study for improvement of Ghagot, Bangshi, Banar Lower, Nagda, Zinai and Gomti rivers for restoration of dry season flow, navigability improvement, flood and erosion management |
BanglaDesh Inter-water Transport Authority |
2017 - 2018 |
National |
Completed |
278 |
RME |
Railway Bridge at Upstream of Bangabandhu Bridge over the Jamuna River - Hydro-morphological Study |
Design Development & Construction |
2017 - 2018 |
National |
Completed |
279 |
IGW |
Groundwater Modelling for Barapukuria Coal Mine Area |
BCMCL |
2017 - 2018 |
National |
Completed |
280 |
WSU |
Feasibility Study of Barapukuria Coal Mine Project 2 |
- N/A - |
2017 - 2018 |
National |
Completed |
281 |
CPI |
Pump Drainage Action Research for Polder 2 |
Stichting Deltares |
2017 - 2018 |
National |
Completed |
282 |
IGW |
Study of Interaction between Haor and River Ecosystem including Development of Wetland Inventory and Sustainable Wetland Management Framework |
Bangladesh Haor & Wetlands Development Board |
2017 - 2021 |
National |
Completed |
283 |
SDT |
Training on Echosounder and OBS 3A |
Military Institute of Science and Technology |
2017 - 2017 |
National |
Completed |
284 |
SDT |
River Survey, Lower Bhadra, Khulna |
Blue Gold Program |
2017 - 2017 |
National |
Completed |
285 |
CPI |
Blue Gold: Innovation and Action Research - Water Management |
Stichting Deltares |
2017 - 2017 |
National |
Completed |
286 |
CPI |
Hydrological Observation and Thematic Study on Storm Tide Influence |
Union Resources & Engineering Co. Ltd. |
2017 - 2017 |
National |
Completed |
287 |
SDT |
Hydrological Data collection at Matarbari for UREC |
Union Resources & Engineering Co. Ltd. |
2017 - 2017 |
National |
Completed |
288 |
WSU |
Shifting of utility lines for Dhaka elevated expressway |
Bangladesh Army |
2017 - 2021 |
National |
Completed |
289 |
ICT |
Mapping for Development of the Land at Moheshkhali Island by Dredging Chars, Shoals for Land Based L.N.G. Terminal |
- N/A - |
2017 - 2017 |
National |
Completed |
290 |
CPI |
Environmental and Morphological Study for Development of the Land at Moheshkhali Island by Dredging Chars, Shoals for Land Based L.N.G. Terminal |
Rupantarita Prakritik Gas Company Limited |
2017 - 2019 |
National |
Completed |
291 |
ED |
DABW Workshop 2017 |
Government of NetherLands |
2017 - 2017 |
National |
Completed |
292 |
ICT |
Identification of Char Lands: Pumpkin against Poverty |
Practical Action, Bangladesh |
2017 - 2017 |
National |
Completed |
293 |
SDT |
Current, Wave and Salinity Measurement for the Matarbari Port Development |
Nippon Koei |
2017 - 2017 |
National |
Completed |
294 |
IGW |
SDIP Phase II - Sustaining Groundwater Irrigation for Food Security in the Northwest Region of Bangladesh |
CSIRO |
2017 - 2020 |
National |
Completed |
295 |
WSU |
Improvement of drainage and road network in new areas of DNCC |
Dhaka |
2017 - 2017 |
National |
Completed |
296 |
WSU |
Uttara 3rd Phase Water Distribution System planning, design and supervision. |
Dhaka Water Supply and Sewerage Authority |
2017 - 2018 |
National |
Completed |
297 |
SDT |
Bathymetric Survey, Sea bed Sampling and SS Sampling and Analysis for the Matarbari Port Development |
Nippon Koei |
2017 - 2017 |
National |
Completed |
298 |
FRM |
Future plan study for West Gopalganj Integrated Water Management Project |
Bangladesh Water Development Board |
2017 - 2017 |
National |
Completed |
299 |
WSU |
Research Partnership for Cities and Climate Change Project |
International Centre for Integrated Mountain Development |
2017 - 2019 |
International |
Completed |
300 |
ED |
Learning Delta Asia Initiatives |
Bangladesh Water Partership |
2017 - 2018 |
National |
Completed |
301 |
CPI |
Feasibility Study for Construction of River Port at Nagarbari, Chilmari; modernization of Baghabari River Port and Construction and Placement of Special Type Terminal Pontoons |
BanglaDesh Inter-water Transport Authority |
2017 - 2017 |
National |
Completed |
302 |
FRM |
Water Resources Vulnerability and Security Assessment of the Yarlung Tsangpo-Brahmaputra Transboundary River Basin |
Yunnan University |
2017 - 2019 |
National |
Completed |
303 |
SDT |
Monitoring Kalni-Kushiyara (Phase-II) |
Bangladesh Water Development Board |
2016 - 2019 |
National |
Completed |
304 |
SDT |
Measurement at Payra Port-3rd Campaign |
Jan De Nul NV, Belgium |
2016 - 2016 |
National |
Completed |
305 |
CPI |
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT STUDY FOR EXTENSION OF COX'S BAZAR AIRPORT |
Civil Aviation Authority of Bangladesh |
2016 - 2017 |
National |
Completed |
306 |
ICT |
Digitization of Mouza Maps, Geo-referencing and Procurement of Satellite Image for Elevated Expressway |
Bangladesh Bridge Authority |
2016 - 2017 |
National |
Completed |
307 |
SDT |
Postwork Survey of Titas River at Titas Upazilla |
Local Government Engineering Department |
2016 - 2016 |
National |
Completed |
308 |
CPI |
HYDROLOGY AND MORPHOLOGICAL STUDY FOR EXTENSION OF COX'S BAZAR AIRPORT |
Civil Aviation Authority of Bangladesh |
2016 - 2017 |
National |
Completed |
309 |
IGW |
Study for Investigation of Groundwater and Surface Water Irrigation in Habiganj, Maulavibazar, Sylhet, Sunamganj, Netrokona and Kishorganj Districts |
Bangladesh Haor & Wetlands Development Board |
2016 - 2019 |
National |
Completed |
310 |
CPI |
WaterApp for Water Resources Management in polder 43/2B and Polder 31-part |
Stichting Deltares |
2016 - 2016 |
National |
Completed |
311 |
WSU |
Design and Implementation of Water Supply Network in Chandrima Model Town |
Dhaka Water Supply and Sewerage Authority |
2016 - 2017 |
National |
Completed |
312 |
CPI |
Feasibility Study for Improvement and Restoration of Navigability for Seven Navigation Routes |
BanglaDesh Inter-water Transport Authority |
2016 - 2017 |
National |
Completed |
313 |
WSU |
Reaching out - disaster crisis management in urban areas |
Airbus-UNS |
2016 - 2019 |
National |
Completed |
314 |
SDT |
Prework Survey for Dredging at Ilisha Ghat to Rajapur |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
315 |
SDT |
Current and Wave Measurement in the Sea near Kutubdia |
None |
2016 - 2017 |
National |
Completed |
316 |
CPI |
Monitoring the Performance of Dredging i/c Hydrological & Morphological Impact by Modelling and Effectiveness of Dredging |
Payra Port Authority |
2016 - 2018 |
National |
Completed |
317 |
SDT |
Topographic and Bathymetric survey of erosion prone area at Jahizzer Char |
Bangladesh Army |
2016 - 2016 |
National |
Completed |
318 |
SDT |
ADCP Measurement and Bed Sampling for Jan De Nul in connection with Payra Port Dredging |
Jan De Nul NV, Belgium |
2016 - 2017 |
National |
Completed |
319 |
WSU |
ESIA Study for Interim Water Supply Project of DWASA |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
320 |
WSU |
Preparation of Action Plan for Control of Pollution of Peripheral Rivers of Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
321 |
CPI |
Research on Assessment of effectiveness of Mangrove Forests for Coastal Protection against Cyclonic Storm Surge: Bangladesh |
The World Bank |
2016 - 2017 |
National |
Completed |
322 |
WSU |
Design of water lines and modelling for Uttara Phase III Apartment Project |
Dhaka Water Supply and Sewerage Authority |
2016 - 2017 |
National |
Completed |
323 |
CPI |
Feasibility Study for Drainage Improvement in Bhabodah Area |
Bangladesh Water Development Board |
2016 - 2017 |
National |
Completed |
324 |
SDT |
Hydrological Data Collection and "Model Simulation" in the Rabnabad Channel near khepupara |
Jan De Nul NV, Belgium |
2016 - 2016 |
National |
Completed |
325 |
RME |
Feasibility Study of Re-excavation of the Bhairab River flowing over Meherpur and Chuadanga Districts |
Bangladesh Water Development Board |
2016 - 2018 |
National |
Completed |
326 |
IGW |
National Water Balance Management System (NAWABS) bagi Lembangan Sungai Muda |
JPS Consultant, Malaysia |
2016 - 2016 |
National |
Completed |
327 |
HRD |
Training to NAHRIM Professionals-2016 |
NAHRIM |
2016 - 2016 |
National |
Completed |
328 |
SPB |
DeltaCap |
Netherlands Embassy |
2016 - 2021 |
National |
Completed |
329 |
CPI |
Techno-Economical Feasibility Study for Development of The Land at Payra Port by Dredging Chars, Shoals For Oil Refinery |
Bangladesh Petroleum Corporation |
2016 - 2017 |
National |
Completed |
330 |
WSU |
Feasibility Study and Detailed Design of Sylhet WTP Project |
Sylhet City Corporation |
2016 - 2017 |
National |
Completed |
331 |
CPI |
Feasibility Study for Improvement of the Navigability of Pussur Channel at Outer Bar Area |
Mongla Port Authority |
2016 - 2016 |
National |
Completed |
332 |
ICT |
Design and Development of HAOR MIS |
Nippon Koei |
2016 - 2017 |
National |
Completed |
333 |
CPI |
Techno-Economical Feasibility Study for Development of the Land at Moheshkhali Island by Dredging Chars, Shoals for Land Based L.N.G. Terminal |
Petrobangla |
2016 - 2016 |
National |
Completed |
334 |
SDT |
Field Survey to Support Plume Study for Coal Fired Power Plant at Munshiganj |
Orion Group |
2016 - 2016 |
National |
Completed |
335 |
SDT |
Survey of Meghna River adjacent to Bhola |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
336 |
SDT |
Services for Review of the Physical Condition and Functionality of Existing Hydraulic Structures of BWDB |
Bangladesh Water Development Board |
2016 - 2017 |
National |
Completed |
337 |
ICT |
Updating and upgrading of SIMS, development of SIMS-Google, SIMS-WEB, SIMS-Mobile |
Bangladesh Water Development Board |
2016 - 2018 |
National |
Completed |
338 |
WSU |
FS and EIA for Secondary Mains of Pagla STP |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
339 |
SDT |
Post work survey of the Norosunda River during 2016 |
Local Government Engineering Department |
2016 - 2016 |
National |
Completed |
340 |
ICT |
Development of Web-GIS Application Phase-I for A2I, PMO |
A2I PMO |
2016 - 2016 |
National |
Completed |
341 |
SDT |
Conducting discharge, water level and percolation Rate measurement at Mathbaria Pourashava |
Dhaka |
2016 - 2016 |
National |
Completed |
342 |
WSU |
Dhaka Eastern Bypass Study |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
343 |
WSU |
Drainage Study of Goranchatbari and Kalyanpur Catchments |
Dhaka Water Supply and Sewerage Authority |
2016 - 2016 |
National |
Completed |
344 |
RME |
Gumti River Dredging - Hydro-morphological Study |
Bangladesh Water Development Board |
2016 - 2018 |
National |
Completed |
345 |
IGW |
Detailed Feasibility Study with ESIA for Restoration of Water Resources around Baral River Basin |
Bangladesh Water Development Board |
2016 - 2019 |
National |
Completed |
346 |
SDT |
Topographic Survey and volume calculation of rehabilitation area (40 acre) for Elevated Expressway PPP Project |
Bangladesh Bridge Authority |
2016 - 2018 |
National |
Completed |
347 |
CPI |
Study to prioritize the proposed inland waterways routes for dredging financing and to undertake detailed feasibility study bid packages. |
HASKONING |
2016 - 2016 |
National |
Completed |
348 |
HRD |
Training on Building Capacity on Climate Change Adaption - BWP 2016 |
Bangladesh Water Partership |
2016 - 2016 |
National |
Completed |
349 |
FRM |
Flash Flood Forecasting & Desimination (IFAD) |
Bangladesh Water Development Board |
2016 - 2019 |
National |
Completed |
350 |
SDT |
Hydromorphological Survey at Sonapahar, Mir Sarai, Chittagong |
Energy |
2016 - 2017 |
National |
Completed |
351 |
SDT |
Topographic and Hydrographic Surveys under Second Rural Transport Improvement Project, RTIP-II (Package - R1) |
Design Development & Construction |
2016 - 2016 |
National |
Completed |
352 |
WSU |
Support to DHI Team for Hydrogeological Investigation in Matarbari, Kutubdia and Moheshkhali Areas |
None |
2016 - 2016 |
National |
Completed |
353 |
RME |
Road bridge on the Gorabhanga River - Hydro-morphological Study |
Good |
2016 - 2016 |
National |
Completed |
354 |
WSU |
Sylhet City Drainage Study |
Bangladesh Water Development Board |
2016 - 2016 |
National |
Completed |
355 |
FRM |
Regional Training Program for Scaling up of Satellite assisted Flood Forecasting Systems in South and Southeast Asian Nations |
None |
2016 - 2018 |
National |
Completed |
356 |
WSU |
Dhaka Eastern Bypass and Drainage Improvement Study by the World Bank |
The World Bank |
2016 - 2016 |
National |
Completed |
357 |
ICT |
Updating and upgrading of SIMS, development of SIMS-Google, SIMS-WEB, SIMS-Mobile |
Bangladesh Water Development Board |
2015 - 2018 |
National |
Completed |
358 |
RME |
Hydro-Morphological Study, IEE & EIA for Construction of Bridge over the River Korotoa under Pirganj Upazila of Rangpur |
Local Government Engineering Department |
2015 - 2016 |
National |
Completed |
359 |
SDT |
Land and Hydrological Survey for Forecast Based Finance Project Survey |
FAO |
2015 - 2016 |
National |
Completed |
360 |
IGW |
Cropping system intensification in the salt-affected coastal zones of Bangladesh and West Bengal, India |
ACIAR |
2015 - 2019 |
National |
Completed |
361 |
IGW |
Study for Upgrading and Rehabilitation of Karnafuli and other Irrigation Projects with ESIA in Hathazari, Rauzan Rangunia, Boalkhali and Fatikchari Upazillas in Chittagong District |
Bangladesh Water Development Board |
2015 - 2018 |
National |
Completed |
362 |
RME |
Hydro-morphological Study to Save the Guide Bund at Barisal End of the Dwarika Bridge on the Sugandha River |
Good |
2015 - 2016 |
National |
Completed |
363 |
SDT |
Topographic Survey for Matarbari Coal Power |
Nippon Koei |
2015 - 2015 |
National |
Completed |
364 |
RME |
Review and Re-design of BPW of Proposed Dharla Bridge in Phulbari Upazilla of Kurigram District |
Local Government Engineering Department |
2015 - 2016 |
National |
Completed |
365 |
SDT |
Topographic and Hydrographic Survey at Moheshkhali |
STEAG Energy Services (India) Pvt. Ltd. |
2015 - 2015 |
National |
Completed |
366 |
SDT |
Water Quality Sampling for Matarbari Power Plant |
Fichtner-NHC JV |
2015 - 2015 |
National |
Completed |
367 |
RME |
Bridges on the Titas and Pagla Rivers - Hydro-morphological Study |
Good |
2015 - 2016 |
National |
Completed |
368 |
CPI |
BIWTA: Environmental and Social Impact Assessment (ESIA) Study for Navigation Improvement of Selected Routes |
BanglaDesh Inter-water Transport Authority |
2015 - 2016 |
National |
Completed |
369 |
WSU |
Extension and rehabilitation of GW monitoring system in Dhaka |
Dhaka Water Supply and Sewerage Authority |
2015 - 2021 |
National |
Completed |
370 |
FRM |
Flood Hazard Model and Index Based Flood Insurance for South Asia with IWMI |
International Institute |
2015 - 2016 |
International |
Completed |
371 |
WSU |
Padma Ph-1 Distribution Strengthening |
Dhaka Water Supply and Sewerage Authority |
2015 - 2015 |
National |
Completed |
372 |
FRM |
Index-based Flood Insurance Coverage for 2015 |
OXFAM, GB |
2015 - 2015 |
National |
Completed |
373 |
RME |
Road Bridge on the Old Brahmaputra River - Hydro-morphological Study |
Good |
2015 - 2015 |
National |
Completed |
374 |
CPI |
Monitoring of Sedimentation, Salinity, Tide & Flood in Kobadak River System & TRM Basin |
Bangladesh Water Development Board |
2015 - 2018 |
National |
Completed |
375 |
RME |
Mathematical Modelling Study and Hydraulic Design of Bundher Bazar Bridge Protection Work |
Mir Akhter Hossain Limited |
2015 - 2015 |
National |
Completed |
376 |
WSU |
Contract Package 2.7 of DESWSP - RFL |
None |
2015 - 2021 |
National |
Completed |
377 |
SDT |
Discharge measurement in the Andharmanik and Bura Gouranga River at Khepupara |
Dhaka |
2015 - 2015 |
National |
Completed |
378 |
SDT |
Hydro-morphological data collection and traffic survey for LGED |
Local Government Engineering Department |
2015 - 2015 |
National |
Completed |
379 |
RME |
Hydraulic and Morphological Study of the Ghorautra River around Mithamain Area in connection with Establishing Cantonment |
- N/A - |
2015 - 2016 |
National |
Completed |
380 |
CPI |
Transaction Advisory Services for Construction of Laldia Bulk Terminal - Bangladesh |
MMM Group Limited |
2015 - 2015 |
National |
Completed |
381 |
CPI |
Hydrological & Morphological Study for Installation of 33KV Submarine Cable from Chittagong to Swandip under Power Distribution System Development Project, Chittagong Zone |
Power Development Board |
2015 - 2016 |
National |
Completed |
382 |
SDT |
Bathymetric Survey for Gorai River Restoration Project from 2014-2017 |
Bangladesh Water Development Board |
2015 - 2017 |
National |
Completed |
383 |
SDT |
Discharge Measurement at Six Location of Plasma Plus |
None |
2015 - 2015 |
National |
Completed |
384 |
RME |
Road Bridges over the Datbhanga and Jharkata Rivers - Hydrological and Morphological Study |
Good |
2015 - 2015 |
National |
Completed |
385 |
FRM |
Mathematical Modelling and Topographic Survey for Haor Flood Management of JICA |
Nippon Koei |
2015 - 2017 |
National |
Completed |
386 |
SDT |
Bathymetric Survey at the outfall of the Sangu River |
Orion Group |
2015 - 2015 |
National |
Completed |
387 |
CPI |
Preparation of DEM and Delineation of Hydrological Boundaries for Polder 2, 26 and 31 |
Euroconsult Mott MacDonald |
2015 - 2015 |
National |
Completed |
388 |
CPI |
Feasibility Study of Capital Dredging in Pussur River from Mongla Port to Rampal Power Plant. |
Mongla Port Authority |
2015 - 2017 |
National |
Completed |
389 |
FRM |
Flood Hydrology Study of the Eastern Part of Dhaka Metropolitan Area |
Rajdhani Unnyan Kortripaksha |
2015 - 2016 |
National |
Completed |
390 |
HRD |
Training on Climate Change to BWP: 2015 |
Bangladesh Water Partership |
2015 - 2015 |
National |
Completed |
391 |
HRD |
Delta Alliance Workshop 2015 |
- N/A - |
2015 - 2015 |
National |
Completed |
392 |
WSU |
Improved pumping system for DWASA |
Dhaka Water Supply and Sewerage Authority |
2015 - 2015 |
National |
Completed |
393 |
HRD |
World Water Day 2015 Workshop |
- N/A - |
2015 - 2015 |
National |
Completed |
394 |
CPI |
The Study of River Bank Erosion Management in Polder 29, Khulna |
Blue Gold Program |
2015 - 2016 |
National |
Completed |
395 |
SDT |
Bathymetric and Hydraulic Survey for Matarbari Power Plant |
Design Development & Construction |
2015 - 2015 |
National |
Completed |
396 |
SDT |
Consultancy services for Post work measurement of 32 km excavated Norosunda River |
Local Government Engineering Department |
2015 - 2015 |
National |
Completed |
397 |
CPI |
Detailed Technical Feasibility Study for Integrated Development of Jahizzer Char |
Military Institute of Science and Technology |
2015 - 2016 |
National |
Completed |
398 |
HRD |
Training for NAHRIM Staffs at IWM |
NAHRIM |
2015 - 2015 |
National |
Completed |
399 |
IGW |
Updating of KAFCO Area Groundwater Assessment and Impact on Environment |
Under Ministry of Industry |
2015 - 2016 |
National |
Completed |
400 |
SDT |
Consultancy services for Quality Control of Protective Work of Cross Bars as per design and specification |
Bangladesh Water Development Board |
2015 - 2016 |
National |
Completed |
401 |
WSU |
Drainage and sanitation master plan for CWASA |
Chittagong WASA |
2015 - 2016 |
National |
Completed |
402 |
CPI |
Consultancy Services for a) Construction Supervision & Detailed Design, b) Preparation of EIA and c) Preparation and Implementation of RAP for CEIP-1 |
Bangladesh Water Development Board |
2015 - 2019 |
National |
Completed |
403 |
CPI |
Community water management for improved food security and livelihoods in the coastal polders |
International Rice Research Institute |
2015 - 2016 |
International |
Completed |
404 |
WSU |
Padma WTP |
Dhaka Water Supply and Sewerage Authority |
2015 - 2017 |
National |
Completed |
405 |
CPI |
The Study of the Stability of Jarirdona River |
CDSP |
2014 - 2015 |
National |
Completed |
406 |
WSU |
Feasibility Study of Rajshahi Water Treatment Plant |
Rajshahi Water Supply & Sewerage Authority |
2014 - 2015 |
National |
Completed |
407 |
CPI |
Feasibility Study on Cluster of Chars (Dhal, Kola Toli and Mozammel) |
Euroconsult Mott MacDonald |
2014 - 2015 |
National |
Completed |
408 |
CPI |
Assessment of potential effect of surface water withdrawal in the Delta region on water flow and salinity level considering various climate change scenarios. |
CIMMYT, Mexico |
2014 - 2016 |
National |
Completed |
409 |
HRD |
Workshop/Conference on Integrated flood management with focus on coastal zones of Bangladesh. |
Bangladesh Water Partership |
2014 - 2014 |
National |
Completed |
410 |
CPI |
Improving Adaptation against coastal vulnerability and enhancing flood forecasting skill through a satellite data integrating modeling framework in changing climate |
National Academy of Sciences |
2014 - 2016 |
National |
Completed |
411 |
RME |
Morphological Mathematical Modelling for Implementation Support to Maintenance Dredging of the Gorai River for Three Years (2014-16) under Gorai River Restoration Project, Phase II |
Bangladesh Water Development Board |
2014 - 2017 |
National |
Completed |
412 |
WSU |
Joint research on 'Institutions for Urban Poor's Access to Ecosystem Services: A Comparison of Green and Water Structures in Bangladesh and Tanzania' |
None |
2014 - 2015 |
National |
Completed |
413 |
WSU |
Rainwater harvesting for artificial recharge |
Dhaka Water Supply and Sewerage Authority |
2014 - 2017 |
National |
Completed |
414 |
FRM |
Study for Islamic Relief |
Islamic Relief, Bangladesh |
2014 - 2016 |
National |
Completed |
415 |
FRM |
Development of water management model for Selangor and Langat River Basin of Malaysia using MIKE BASIN |
NAHRIM |
2014 - 2017 |
National |
Completed |
416 |
SDT |
Bathymetric Survey in the Padma River at Mawa Ghat during August 2014 |
Bangladesh Bridge Authority |
2014 - 2014 |
National |
Completed |
417 |
SDT |
BM Establishment for 12 Blue Gold Polder |
Dhaka |
2014 - 2014 |
National |
Completed |
418 |
CPI |
Planning, Design and Monitoring of Community Based Water Management System in Polder 30 for Blue Gold Program |
Blue Gold Program |
2014 - 2015 |
National |
Completed |
419 |
CPI |
Training on Hydrodynamic, Spectral Wave, Sand Transport Mod Transport Model by using Mike 21 Software |
NAHRIM |
2014 - 2014 |
National |
Completed |
420 |
WSU |
Drainage study of five khals in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2014 - 2014 |
National |
Completed |
421 |
ICT |
Web-GIS Based Salinity Information System |
The World Bank |
2014 - 2014 |
National |
Completed |
422 |
ICT |
Website Development for Bangladesh Water Partnership (BWP) |
Bangladesh Water Partership |
2014 - 2015 |
National |
Completed |
423 |
FRM |
Strengthening the Capacity of Satellite-based Flood Forecasting using Near Real-Time JASON-2 Satellite Altimeter Data |
International Centre for Integrated Mountain Development |
2014 - 2015 |
International |
Completed |
424 |
RME |
RBIP Numerical Modelling |
Fichtner-NHC JV |
2014 - 2014 |
National |
Completed |
425 |
RME |
RBIP Numerical Modelling - Supporting Study |
Fichtner-NHC JV |
2014 - 2014 |
National |
Completed |
426 |
IGW |
Mohananda River Dredging, Rubber Dam Study |
Bangladesh Water Development Board |
2014 - 2015 |
National |
Completed |
427 |
ICT |
Web-GIS Based Salinity Information System |
The World Bank |
2014 - 2014 |
National |
Completed |
428 |
ICT |
Mapping BRACs Presence through Geographical Information System (GIS) |
BRAC |
2014 - 2014 |
National |
Completed |
429 |
SDT |
Topographic and Bathymetric Survey of Kathalia River from Batakandi Bazar to Kathalia |
Dhaka |
2014 - 2014 |
National |
Completed |
430 |
FRM |
Sattelite based Flood Forecasting System at FFWC |
International Institute |
2014 - 2015 |
International |
Completed |
431 |
CPI |
Mapping Exercise on Water Logging in Southwest Region of Bangladesh |
FAO |
2014 - 2014 |
National |
Completed |
432 |
CPI |
BIWTA: Morphological Study, Design & Supervision and EIA/SIA of the Twelve Navigation Routes |
BanglaDesh Inter-water Transport Authority |
2014 - 2018 |
National |
Completed |
433 |
CPI |
Formulation of the Bangladesh Delta Plan 2100 |
Twynsta Gudde |
2014 - 2016 |
National |
Completed |
434 |
CPI |
Delta Plan 2100 |
Dhaka |
2014 - 2016 |
National |
Completed |
435 |
ICT |
Active Project 1 |
Bangladesh Water Development Board |
2014 - 2014 |
National |
Completed |
436 |
SDT |
Topographic Survey for Kanchpur, Meghna and Gumti 2nd Bridges Constrcution |
Dhaka |
2014 - 2014 |
National |
Completed |
437 |
SDT |
Hydrographic Survey for DWASA in the Meghna at Bishnondi |
Dhaka Water Supply and Sewerage Authority |
2014 - 2014 |
National |
Completed |
438 |
FRM |
Assess the Impacts of 40 acres Land Filling from BWDB Retention Ponding Area at Digun Mouza near Uttara Ph-3 |
None |
2014 - 2014 |
National |
Completed |
439 |
SDT |
Hydrographic Survey for Padma Bridge during March 2014 |
Good |
2014 - 2014 |
National |
Completed |
440 |
FRM |
Transboundary Data and Rainfall Prediction |
UNESCO-IHE |
2014 - 2015 |
National |
Completed |
441 |
SDT |
Miscellaneous field survey & equipment rental |
IWM |
2014 - 2014 |
National |
Completed |
442 |
HRD |
IWM-BWP Regional Workshop |
Bangladesh Water Partership |
2014 - 2014 |
National |
Completed |
443 |
SDT |
Hydrographic Survey for Feasibility Study for Integrated Development of Jahajer Char |
Military Institute of Science and Technology |
2014 - 2014 |
National |
Completed |
444 |
RME |
Updating of Final Report - Mathematical Model Study for Protection of Gaibandha District from Erosion of the Jamuna River |
Bangladesh Water Development Board |
2014 - 2014 |
National |
Completed |
445 |
SDT |
Topographic Survey for CYMMIT |
Dhaka |
2014 - 2014 |
National |
Completed |
446 |
CPI |
Bangladesh Coastal Vulnerability and Sea Level Rise Hazards |
Ohio State University |
2014 - 2016 |
National |
Completed |
447 |
SDT |
Topographic Survey of the NR Routes for Transmission pipe line of CWASA |
Dhaka |
2014 - 2014 |
National |
Completed |
448 |
FRM |
Hydraulic Study for determining design parameters of a connectivity channel of a housing development project for Bangladesh Police Officer. |
- N/A - |
2014 - 2014 |
National |
Completed |
449 |
SDT |
Hydrographic Survey for Orion Power Development at Munshiganj |
Orion Group |
2014 - 2014 |
National |
Completed |
450 |
SDT |
Hydrographic Survey for Orion Power Development at Khulna |
Orion Group |
2014 - 2014 |
National |
Completed |
451 |
FRM |
EU-Global Earth Observation for Integrated Water Resources Assessment (eartH2Observe) |
European Union |
2014 - 2017 |
National |
Completed |
452 |
FRM |
SDIS Project: Bangladesh Water Resource |
- N/A - |
2014 - 2014 |
National |
Completed |
453 |
WSU |
Jashaldia RAP Studies |
Dhaka Water Supply and Sewerage Authority |
2014 - 2016 |
National |
Completed |
454 |
WSU |
Integrated Water Project (Lot 1 and 3) in Turkey |
CarlBro |
2014 - 2015 |
National |
Completed |
455 |
SDT |
Quality Control and Impact assessment for 2nd Year Maintenance Dredging during 2013-14 under Capital Dredging Project |
Bangladesh Water Development Board |
2013 - 2015 |
National |
Completed |
456 |
CPI |
Bhola Erosion Management project-ORIOProgram |
HASKONING |
2013 - 2014 |
National |
Completed |
457 |
WSU |
Assessment of State of Water Resources, WARPO |
WARPO |
2013 - 2015 |
National |
Completed |
458 |
RME |
Technical Study to Judge the Feasibility of Installing Additional Jetty Structure at the River Bank of Surma River |
LAFARGE |
2013 - 2014 |
National |
Completed |
459 |
WSU |
Rural Water Supply Project. |
Local Government Engineering Department |
2013 - 2017 |
National |
Completed |
460 |
FRM |
Local Level Flood Forecasting (JAXA) |
Asian Development Bank |
2013 - 2015 |
National |
Completed |
461 |
IGW |
Availability Study on Groundwater Resources for Selangor Water Management Authority |
LEMBAGA URUS AIR SELANGOR |
2013 - 2015 |
National |
Completed |
462 |
SDT |
Bathymetric Survey and Monitoring for supporting Maintenance dredging of Gorai River Restoration Project (Phase-II) during 2013-14 |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
463 |
WSU |
Consultancy services for Network Analysis in Chittagong City |
Chittagong WASA |
2013 - 2021 |
National |
Completed |
464 |
WSU |
Study of Kalyanpur Regulating Pond |
Dhaka Water Supply and Sewerage Authority |
2013 - 2013 |
National |
Completed |
465 |
CPI |
Training Program on Hydrological, Hydrodynamic, Morphological, Salinity and Water Quality Model for Sungai Sarawak, Malaysia |
NAHRIM |
2013 - 2014 |
National |
Completed |
466 |
CPI |
Consultancy Services for Detailed Design, Social and Environmental Studies for Construction of Urir Char - Noakhali Cross-Dam Project (UCNCP) |
HASKONING |
2013 - 2014 |
National |
Completed |
467 |
RME |
Morphological Modelling for GRRP-II: One Year Extension 2013-14 |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
468 |
SDT |
Padma Bridge Bathymetric Survey during September 2013 |
Dhaka |
2013 - 2013 |
National |
Completed |
469 |
WSU |
Groundwater investigation for water supply to Chittagong city |
Chittagong WASA |
2013 - 2015 |
National |
Completed |
470 |
CPI |
Assessment of Erosion Vulnerability of East Bank of Meghna River and Re-location of the Proposed DS-3 in Noler Char |
CDSP |
2013 - 2013 |
National |
Completed |
471 |
SDT |
RTW Bathymetry Surveys and ADCP Measurement of Various Rivers in Support of RTW Hydrotechnical Investigations of Major Rivers |
Dhaka |
2013 - 2013 |
National |
Completed |
472 |
RME |
Monitoring of Hydraulic and Morphological Conditions of Jamuna River for the Safety of the RTW of Bangabandhu Bridge during the year 2013-2017 |
JMBA |
2013 - 2018 |
National |
Completed |
473 |
RME |
Rupsha River Mathematical Modeling Study for the Proposed Railway Bridge in connection with Khulna-Mongla Port Rail Line Project |
Design Development & Construction |
2013 - 2013 |
National |
Completed |
474 |
SDT |
Tidal Discharge Measurements and Suspended Sediment Sample Collection in Connection with the Feasibility Study of Char Maksumul Hakim Under CDSP-IV |
Design Development & Construction |
2013 - 2013 |
National |
Completed |
475 |
SDT |
Beel & Fish-Sanctuary Survey & Preparation of Inundation Maps of Fish Rings under Different Wave Level |
Malyasian Consultant |
2013 - 2013 |
National |
Completed |
476 |
FRM |
Increase of Flood Forecasting Stations within the Existing Network of Flood Forecasting Model for more Localised Flood Forecast under Research and Prediction Modelling |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
477 |
FRM |
IEE & EIA of Ashuganj 450 MW CCPP |
Dhaka |
2013 - 2013 |
National |
Completed |
478 |
IGW |
Survey & Investigation of Water Resources Management by Mathematical Modelling of Panchagarh, Thakurgaon, Dinajpur and Joypurhat Integrated Agriculture Development Project |
N/A |
2013 - 2015 |
National |
Completed |
479 |
CPI |
Training on Hydrodynamic, Wave & Mud Transport Modelling |
Malyasian Consultant |
2013 - 2013 |
National |
Completed |
480 |
CPI |
Effects of Climate Change on hydrology, water management and salinity of selected Sorjan systems and resilient measures in the southwest coastal area of Bangladesh |
Challenge Program on Water and Food |
2013 - 2014 |
National |
Completed |
481 |
CPI |
Techno-Economic Feasibility study for 3rd Sea Port at Robnabad Channel, Patuakhali |
Chittagong Port Authority |
2013 - 2013 |
National |
Completed |
482 |
WSU |
Saidabad WTP, Phase-III |
Dhaka Water Supply and Sewerage Authority |
2013 - 2015 |
National |
Completed |
483 |
ICT |
Basic GIS Training on ArcGIS 10 for SOBs professional |
Survey of Bangladesh |
2013 - 2013 |
National |
Completed |
484 |
CPI |
Mathematical Modelling and Technical Feasibility Study for Planning and Design of Erosion Mitigation Measures of BIJBardahnKhamar at Char Banshbaria, Dasmina |
BanglaDesh Inter-water Transport Authority |
2013 - 2013 |
National |
Completed |
485 |
WSU |
Floodplain wetland study in the Ganges-Brahmanputra basin |
- N/A - |
2013 - 2014 |
National |
Completed |
486 |
CPI |
Heat Dispersion and morphological Modelling for Ashuganj Power Plant |
Danish Hydraulic Institute |
2013 - 2013 |
National |
Completed |
487 |
CPI |
Assessment of Sea Level Rise and Vulnerability in the Coastal Zone of Bangladesh through Trend Analysis |
CEGIS |
2013 - 2015 |
National |
Completed |
488 |
SDT |
Groundwater Level Measurement, Sampling, Monitoring and RL Survey in the Coastal Area of Bangladesh (Extension) |
Department of Public Health |
2013 - 2013 |
National |
Completed |
489 |
FRM |
Establishment of Regional Flood Information system under HKH-HYCOS of ICIMOD |
International Institute |
2013 - 2014 |
International |
Completed |
490 |
CPI |
Char Development and Settlement Project–IV (CDSP-IV). |
CDSP |
2013 - 2013 |
National |
Completed |
491 |
RME |
Mathematical Morphological Modelling of the Jamuna River in Connection with the Proposed Power Plant in Sirajganj |
LANCO International Pte Ltd |
2013 - 2013 |
National |
Completed |
492 |
WSU |
Routine Inundation Mapping and Rainfall Monitoring in Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2013 - 2014 |
National |
Completed |
493 |
RME |
Feasibility Study for the Re-Excavation of Titas River (Upper) under Brahmanbaria District |
Bangladesh Water Development Board |
2013 - 2014 |
National |
Completed |
494 |
SDT |
Inventory, X-Section Survey and survey of farmers canal system of the Muhuri Irrigation Project |
Asian Development Bank |
2013 - 2014 |
National |
Completed |
495 |
FRM |
Flood Modeling for ADB funded project of Main River and Bank Erosion Management |
Dhaka |
2013 - 2013 |
National |
Completed |
496 |
SDT |
Survey of 16 Rivers for FSCD in c/w Capital Dredging Project |
Dhaka |
2013 - 2014 |
National |
Completed |
497 |
WSU |
Design Review and Supervision of wellfield in Tetulkhara-Bhakurta |
Dhaka Water Supply and Sewerage Authority |
2013 - 2016 |
National |
Completed |
498 |
CPI |
EIA of the proposed dredging project at the outer bar area of Pussur Channel |
Mongla Port Authority |
2012 - 2013 |
National |
Completed |
499 |
RME |
Betagi Bridge - Mathematical Hydro-morphological Modelling |
Dhaka |
2012 - 2013 |
National |
Completed |
500 |
RME |
Golachipa, Bhandaria and Babuganj Bridges - Mathematical Hydro-morphological Modelling |
Dhaka |
2012 - 2013 |
National |
Completed |
501 |
ICT |
Website Design, Development and Maintenance for the Office of Flood Forecasting and Warning Centre (FFWC), BWDB |
Bangladesh Water Development Board |
2012 - 2014 |
National |
Completed |
502 |
FRM |
JICA Data collection Survey on WRM in Haor Areas of Bangladesh |
Dhaka |
2012 - 2013 |
National |
Completed |
503 |
RME |
Bekutia Bridge - Mathematical Hydro-morphological Modelling |
Dhaka |
2012 - 2013 |
National |
Completed |
504 |
SDT |
Survey for dredging at Lafarge Surma Cement Ltd. Jetty and Ferry Pontoon area at Chattak during Nov'02 |
LAFARGE |
2012 - 2012 |
National |
Completed |
505 |
WSU |
India-Bangladesh Joint Research on Wetlands Trends & Status |
None |
2012 - 2013 |
National |
Completed |
506 |
IGW |
Hydrogeological Study & Groundwater Modelling for Barapukuria Coal Mine Area |
BCMCL |
2012 - 2014 |
National |
Completed |
507 |
CPI |
Quick assessment of Dhaka and coastal polder sub-sidence |
- N/A - |
2012 - 2013 |
National |
Completed |
508 |
FRM |
Hydrological Study of Tipai Mukh |
JRC |
2012 - 2018 |
National |
Completed |
509 |
SDT |
Quality control and Monitoring of Pilot Dredging of Jamuna River from Sirajganj Hardpoint to Dhaleswari Offtake (20 Km) (2nd year maintenance dredging) |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
510 |
FRM |
Flood Risk Management for Cagayan De Oro River in Philippine |
International Institute |
2012 - 2013 |
International |
Completed |
511 |
CPI |
TRAINING ON SEDIMENT TRANSPORT MODELING FOR SG. LUI, SELANGOR, MALAYSIA |
NAHRIM |
2012 - 2012 |
National |
Completed |
512 |
SDT |
Training of RBPP |
Bangladesh Water Development Board |
2012 - 2012 |
National |
Completed |
513 |
FRM |
Developing Alternative Risk Transfer Mechanism of Disaster & Climate Vulnerable Communities |
OXFAM, GB |
2012 - 2014 |
National |
Completed |
514 |
RME |
2nd Bhairab and Titas Bridges - Hydro-morphological Study |
Dhaka |
2012 - 2012 |
National |
Completed |
515 |
IGW |
Preparing the Bagmati River Basin Improvement Project in Nepal |
Danish Hydraulic Institute |
2012 - 2013 |
International |
Completed |
516 |
CPI |
Coastal Hydraulic and Morphological Study for Protection of Marine-drive |
Good |
2012 - 2014 |
National |
Completed |
517 |
WSU |
Study on Water logging of Greater Dhaka Area in a Changing Climate: Potential Damage and Adaptation |
The World Bank |
2012 - 2014 |
National |
Completed |
518 |
CPI |
Feasibility Study for Drainage Improvement of Polder 1,2 & 6-8 by Mathematical Modelling under the Satkhira District. |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
519 |
SDT |
Bathymetric Survey at Kushiyara River near North Pad BYGP during 2012 |
Chevron Bangladesh |
2012 - 2013 |
National |
Completed |
520 |
CPI |
Feasibility Study for Rehabilitation of Polder 36/1 Using Model Technique (Math Model) |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
521 |
RME |
Mathematical Model Study of Norosunda River |
Local Government Engineering Department |
2012 - 2012 |
National |
Completed |
522 |
CPI |
Mathematical Modelling Study of Excavation of Pilot Channel of the D/S of Feni Regulator |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
523 |
FRM |
Kalni-Kushiyara Dredging Modelling & Monitoring |
Bangladesh Water Development Board |
2012 - 2016 |
National |
Completed |
524 |
SDT |
BUET: Discharge Measurement at Siddirgonj (2nd Time) |
Bangladesh University of Engineering & Technology |
2012 - 2012 |
National |
Completed |
525 |
SDT |
Additional Hydrographic and Topographic Survey at proposed Bekutia Bridge, Pirojpur |
Dhaka |
2012 - 2012 |
National |
Completed |
526 |
SDT |
Ground water monitoring for JAR |
Department of Public Health |
2012 - 2012 |
National |
Completed |
527 |
CPI |
Malaysia: HYDRAULIC and Salinity MODELLING for THE DETAILed DESIGN OF ALL WORKS RELATED TO "LENCONGAN BANJIR BARAT TIMAH TASOH", PERLIS |
Malyasian Consultant |
2012 - 2012 |
National |
Completed |
528 |
FRM |
Flood Forecast and Inundation Modeling in Bagmati Adhwara Basin, India |
Danish Hydraulic Institute |
2012 - 2013 |
National |
Completed |
529 |
FRM |
Modernization and Integration of the Hydrology Network under BRIC |
Bangladesh Water Development Board |
2012 - 2013 |
National |
Completed |
530 |
CPI |
Salinity Intrusion Modelling and development of salinity Information System |
The World Bank |
2012 - 2014 |
National |
Completed |
531 |
WSU |
DWASA: Dhaka Water Supply Master Plan Study |
Joint Venture |
2012 - 2013 |
National |
Completed |
532 |
SDT |
BUET: Discharge Measurement at Siddirgonj (1st Time) |
Bangladesh University of Engineering & Technology |
2012 - 2012 |
National |
Completed |
533 |
CPI |
Multi-hazard risk and vulnerability assessment modelling and mapping |
Disaster Management Bureau |
2012 - 2014 |
National |
Completed |
534 |
RME |
Bhangura - Nawgaon GCM Road Improvement - Hydrological & Hydraulic Study and EIA |
Local Government Engineering Department |
2012 - 2012 |
National |
Completed |
535 |
CPI |
Detailed Feasibility Study in connection with Protection of Ramgati and Kamal Nagar upazilla and adjacent areas under Laxmipur District from the continuing erosion of the Meghna River |
Bangladesh Water Development Board |
2012 - 2012 |
National |
Completed |
536 |
FRM |
Water availability, demand and adaptation option assessment of the Brahmaputra River Basin under climate change" |
Dhaka |
2012 - 2013 |
National |
Completed |
537 |
ADM |
Support to Wageningen University Research Center local office in Dhaka, Bangladesh |
- N/A - |
2011 - 2012 |
National |
Completed |
538 |
ICT |
Survey and mapping works of Ruppur NPP Project under Engineering land survey for the Feasibility Stage |
Bangladesh Atomic Energy Comission |
2011 - 2013 |
National |
Completed |
539 |
RME |
Bridge across Borobhanga River (Gap No. 25/1) at 25th Km of Sylhet-Sultanpur-Balagonj Road - Hydrological and Morphological Study with EIA |
Good |
2011 - 2012 |
National |
Completed |
540 |
SDT |
Survey for Lafarge Surma cement |
LAFARGE |
2011 - 2011 |
National |
Completed |
541 |
WSU |
Future Assessment of Water Resources in Bangladesh |
International Institute |
2011 - 2015 |
International |
Completed |
542 |
RME |
Gorai Offtake Management Mathematical Modelling Study |
HASKONING |
2011 - 2012 |
National |
Completed |
543 |
SDT |
Pre-Feasibility Study to Restore the Environment of the Kaptai Lake |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
544 |
SDT |
Dredging of Surma-Baulai River System Improvement of existing Embkt & Drainage Channel by Using Math Model & State -of-the Art Survey Technique |
Bangladesh Water Development Board |
2011 - 2015 |
National |
Completed |
545 |
SDT |
Survey for Chevron at Bibyana during October 2011 |
Chevron Bangladesh |
2011 - 2011 |
National |
Completed |
546 |
CPI |
Feasibility Study for Drainage Improvement and Sustainable Water Management of Bhairab River Basin |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
547 |
FRM |
Support to JICA for Water Resources Development Projects in Meghna Basin' |
Dhaka |
2011 - 2012 |
National |
Completed |
548 |
CPI |
IRRI: Increasing the Resilience of Agricultural and Aquaculture Systems in the Coastal Area of Ganges Delta |
- N/A - |
2011 - 2014 |
National |
Completed |
549 |
RME |
Mathematical Modelling in connection with Preparation of Master Plan for Ashuganj Power Station |
Dhaka |
2011 - 2012 |
National |
Completed |
550 |
ED |
Evaluation of IPSWAM Project |
Government of NetherLands |
2011 - 2011 |
National |
Completed |
551 |
CPI |
Bangla-Dutch research initiative on morphological assessment |
IWM |
2011 - 2014 |
National |
Completed |
552 |
SDT |
Topographic Survey for Road Bridge at Bekutia, Pirojpur |
Dhaka |
2011 - 2011 |
National |
Completed |
553 |
FRM |
Research with CSIRO, Australia on Integrated Water Resources Assessment in Bangladesh' |
Dhaka |
2011 - 2014 |
National |
Completed |
554 |
WSU |
IUCN Joint Research Project |
None |
2011 - 2011 |
National |
Completed |
555 |
FRM |
Bangla-Dutch Research Initiative on Flood Risk Management |
Government of NetherLands |
2011 - 2015 |
National |
Completed |
556 |
IGW |
Groundwater Resource study for 8 disricts of Rajshahi Divison, BMDA Phase -2 |
N/A |
2011 - 2014 |
National |
Completed |
557 |
SDT |
RRI: Collecting hydraulic and morphological data at the Upstream of the Bangabandhu Bridge |
River Research Institute |
2011 - 2011 |
National |
Completed |
558 |
FRM |
Updating of O&M Manual of Teesta Barrage and it's CHR |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
559 |
CPI |
SW-KJDRP: Monitoring & Evaluation of the Hydrological & Morphological Conditions of Rivers & Drainage Problems of Beels in the KJDRP area for the Planning of Drainage Improvement Measures |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
560 |
CPI |
Feasibility Study for the Coastal Embankment Improvement Project |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
561 |
CPI |
CGIAR-CPWF: Water governance and community based management |
International Institute |
2011 - 2014 |
International |
Completed |
562 |
SDT |
Collecting HYDROGRAPHIC SURVEYS IN THE JAMUNA AND PADMA NEAR BANGABANDHU BRIDGE & BARURIA |
Bangladesh Water Development Board |
2011 - 2015 |
National |
Completed |
563 |
FRM |
Upgrading of Flood Forecasting System under CDMP II |
Bangladesh Water Development Board |
2011 - 2014 |
National |
Completed |
564 |
IGW |
Package-1: Mathematical Modelling Study (Groundwater and Surface Water) |
Bangladesh Water Development Board |
2011 - 2014 |
National |
Completed |
565 |
IGW |
Package - 2 Math Modelling Saline Water Intrusion - MIS |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
566 |
IGW |
Package-3 Hydrological Study & Modelling |
Bangladesh Water Development Board |
2011 - 2015 |
National |
Completed |
567 |
CPI |
Monotoring and Hydraulic Investigation for evaluation the performance of Navigation Improvement work of Mongla Port |
Mongla Port Authority |
2011 - 2015 |
National |
Completed |
568 |
RME |
Langalbandh - Naduria Ghat Road Bridge Hydrological & Morphological Study |
Good |
2011 - 2011 |
National |
Completed |
569 |
ED |
Delta Alliance Bangladesh Wing: Networking, Research and Workshop |
- N/A - |
2011 - 2014 |
National |
Completed |
570 |
SDT |
Pre-monsoon bathymetric survey at the Kushiyara River near North Pad, Bibiyana Gas Plant |
Chevron Bangladesh |
2011 - 2011 |
National |
Completed |
571 |
CPI |
CPWF: Assessment of Impacts of anticipated external drivers of change on water resources of the coastal zone |
Challenge Program on Water and Food |
2011 - 2014 |
National |
Completed |
572 |
CPI |
Water Modelling for Sungai Langat basin ( river & ground water ) for water abstraction studies of Megasteel |
Zaaba SDN BHD |
2011 - 2011 |
National |
Completed |
573 |
SDT |
Hydrographic Survey in the Kocha River at Bekutia in the Pirojpur District |
Dhaka |
2011 - 2011 |
National |
Completed |
574 |
HRD |
Training to NAHRIM on Mike SHE and MIKE BASIN |
NAHRIM |
2011 - 2011 |
National |
Completed |
575 |
WSU |
National Hygiene Promotion Strategy for WSS' |
Department of Public Health |
2011 - 2011 |
National |
Completed |
576 |
RME |
Mathematical Modelling for Future Plan Development - After Excavation of Chandana-Barasia River |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
577 |
RME |
Narail - Kalia Bridge on the Naboganga River - Hydro-morphological Study |
Good |
2011 - 2011 |
National |
Completed |
578 |
CPI |
Sundarban: Bangladesh Climate Change Adaptation, Biodiversity Conservation & Sustainable Socio-Economic Development of the Sundarban Area- Non-lending Technical Asistance |
The World Bank |
2011 - 2012 |
National |
Completed |
579 |
RME |
Review of Location of the Proposed Matlab Bridge over the River Dhanagoda Matlab under Chandpur Road Division |
Good |
2011 - 2011 |
National |
Completed |
580 |
SDT |
Topographic Survey for Muhuri Irrigation Project |
Dhaka |
2011 - 2011 |
National |
Completed |
581 |
SDT |
West Gopalgonj IWMP |
Dhaka |
2011 - 2011 |
National |
Completed |
582 |
RME |
Kumarkhali - Jodu Boyra bridge on the gorai river- Hydrological & Morphological Modelling |
Good |
2011 - 2011 |
National |
Completed |
583 |
RME |
Mathematical Morphological Modelling in connection with Sustainable River Management Plan for Main Rivers, Distributaries and Tributaries in Bangladesh |
Bangladesh Water Development Board |
2011 - 2013 |
National |
Completed |
584 |
FRM |
Support to FFWS for Pumpunga and Agno River Basins in Philippines |
Dhaka |
2011 - 2011 |
National |
Completed |
585 |
RME |
Hydro-morphological Studies for LGED 9 Bridges in the SW Region |
Local Government Engineering Department |
2011 - 2013 |
National |
Completed |
586 |
RME |
Morphological Study for the Selected Offtake in Connection with the Buriganga Augmentation Project |
Bangladesh Water Development Board |
2011 - 2016 |
National |
Completed |
587 |
SDT |
Quality control, Monitoring and Impact Assessment of Pilot Dredging of Jamuna River at 2 locations from Sirajganj Hardpoint to Dhaleswari Offtake (20 Km) and Near the Nalini Bazar (2 Km) |
Bangladesh Water Development Board |
2011 - 2012 |
National |
Completed |
588 |
CPI |
Rehabilitation of Bhutiar beel and Barnal Salimpur Kolabashukhali FCD Project in Khulna District |
Bangladesh Water Development Board |
2010 - 2012 |
National |
Completed |
589 |
CPI |
Hydraulic Study for Planning and Design of Dredging of Chaplirdoon River using Mathematical Modelling |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
590 |
WSU |
Sewerage Master Plan of Dhaka City |
Dhaka Water Supply and Sewerage Authority |
2010 - 2012 |
National |
Completed |
591 |
ICT |
National MIS for Water Supply & Sanitation Project |
Department of Public Health |
2010 - 2011 |
National |
Completed |
592 |
RME |
Mathematical Morphological Modelling for Kushiyara River near North Pad |
Chevron Bangladesh |
2010 - 2011 |
National |
Completed |
593 |
CPI |
ADB Aided- Port and Logistics Efficiency Improvement (Mongla & Benapole) |
Dhaka |
2010 - 2011 |
National |
Completed |
594 |
SDT |
Pre-Interim-Post Survey for dredging at Lafarge Surma Cement Ltd. Jetty area at Chattak |
LAFARGE |
2010 - 2010 |
National |
Completed |
595 |
CPI |
CDMP: Impact of Climate Change on salinity intrusion and zoning of salinity level for assessment of Community risk in the Coastal Area |
CDMP |
2010 - 2012 |
National |
Completed |
596 |
RME |
Hydro-morphological Study of the Korotoya River around Baradaha Bridge Location in Gaibandha |
Good |
2010 - 2011 |
National |
Completed |
597 |
SDT |
Hydrographic and Topographic Survey of the Kushiara River near Bibiyana Gas field during monsoon 2010 |
Chevron Bangladesh |
2010 - 2011 |
National |
Completed |
598 |
RME |
Monitoring of Hydraulic and Morphological Conditions for the Safety of the Jamuna Multipurpose Bridge for the Year 2011. |
JMBA |
2010 - 2012 |
National |
Completed |
599 |
IGW |
Joint Action Research on Salt Water Intrusion in Groundwater in the Coastal Area |
Danish International Development Agency |
2010 - 2014 |
International |
Completed |
600 |
FRM |
Hydro-morphological Study of Itna-Mithamain-Austagram Road under Kishoreganj District, |
Good |
2010 - 2012 |
National |
Completed |
601 |
FRM |
Mathematical Modelling Study of Sureswar FCDI Project |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
602 |
FRM |
Drainage and Irrigation Improvement Study of Beel Gazna and Adjoining Areas of Pabna District |
Bangladesh Water Development Board |
2010 - 2016 |
National |
Completed |
603 |
RME |
Morphological Mathematical Modelling for Planning, Design, Monitoring and Quality Control of Dredging for Gorai River Restoration Project, Phase II |
Bangladesh Water Development Board |
2010 - 2013 |
National |
Completed |
604 |
CPI |
Cyclone-Induced Storm Surge Modelling and Assessment of Storm Surge Height for the Construction of Cyclone Shelter in the Coastal Region of Bangladesh |
Islamic Development Bank |
2010 - 2011 |
National |
Completed |
605 |
FRM |
Mathematical Modelling Study for Tarail Pachuria FCDI Project (Phase II) |
Bangladesh Water Development Board |
2010 - 2012 |
National |
Completed |
606 |
SDT |
Bathymetric Survey for Padma Bridge Design during 2010 monsoon |
Dhaka |
2010 - 2011 |
National |
Completed |
607 |
FRM |
Greater Mekong Sub-region Flood and Drought Risk Management and Mitigation Project |
Dhaka |
2010 - 2011 |
National |
Completed |
608 |
RME |
Mathematical Modelling of the Ganges in connection with the Proposed Rooppur Power Plant |
Bangladesh Atomic Energy Comission |
2010 - 2011 |
National |
Completed |
609 |
RME |
Rajbari Town Protection |
Bangladesh Water Development Board |
2010 - 2010 |
National |
Completed |
610 |
RME |
Mathematical Modelling Study for the Protection of the Padma Left Bank around Sreenagar and Dohar Upazilla |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
611 |
RME |
Hydrological and Morphological Study and Supervision of Construction Works for 11 Nos. Bridges at Different Upazillas of Barishal, Pirozpur, Bhola and Jhalokati Districts Under GBDRCHBIDP |
Local Government Engineering Department |
2010 - 2011 |
National |
Completed |
612 |
RME |
Study of Impact of Dredging at 3.17km Upstream of Hardinge Bridge on the Ganges River |
Bangladesh Water Development Board |
2010 - 2010 |
National |
Completed |
613 |
ICT |
MIS for S.W. Area IWRM |
DHV-Devcon-Kranti-DPMC |
2010 - 2011 |
National |
Completed |
614 |
CPI |
Effect of climate Change on Cholera Dynamics and Prediction (Research Project) |
- N/A - |
2010 - 2011 |
National |
Completed |
615 |
RME |
Road Bridge on Dhonagoda River at Motlab Thana under Chandpur District |
Good |
2010 - 2010 |
National |
Completed |
616 |
CPI |
Mathematical Modelling Study for Integrated Water Management Project of Polder 34/2 in Bagherhat Dist. |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
617 |
IGW |
Strengthening BMDA’s Capacity on Water Resources Management |
Local Government Engineering Department |
2010 - 2011 |
National |
Completed |
618 |
CPI |
Halda Water Modelling Study for Assessment of Sustainability of Restoration of Spawning Ground in the Halda River. |
Directorate of Fisheries |
2010 - 2011 |
National |
Completed |
619 |
FRM |
Gungaijuri Hoar FCD Project |
Bangladesh Water Development Board |
2010 - 2011 |
National |
Completed |
620 |
WSU |
Khulna GW Study for Drinking Water Supply”. |
Asian Development Bank |
2010 - 2010 |
National |
Completed |
621 |
SDT |
Preliminary route survey for laying high pressure gas transmission pipeline |
Energy |
2010 - 2010 |
National |
Completed |
622 |
CPI |
Hydraulic Study for Chevron to support drilling rig at Char Kajol |
Chevron Bangladesh |
2010 - 2010 |
National |
Completed |
623 |
FRM |
Water Resources Development Project in SW Region under JICA |
Dhaka |
2010 - 2010 |
National |
Completed |
624 |
WSU |
Feasibility Study of Pagla WTP |
Dhaka Water Supply and Sewerage Authority |
2010 - 2011 |
National |
Completed |
625 |
RME |
Hydrological and Morphological Study for the Proposed Re-excavation of Old Madhumati River under Gopalganj District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
626 |
SDT |
Dry Season Topographic & Bathymetric Survey, South Bank for River Training Work of Padma Multipurpose Bridge Project |
Dhaka |
2010 - 2010 |
National |
Completed |
627 |
CPI |
Monitoring of drainage, salinity and sedimentation of Baggar Dona River Catchment area under CDSP-III |
CDSP |
2010 - 2011 |
National |
Completed |
628 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Karua Natunbazar Road over Someswari River at Sreebardi Upazila in Sherpur District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
629 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Gorai River at Kushtia Sadar Upazilla under Kushtia District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
630 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Bangshi River at Dhamrai Upazilla under Dhaka District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
631 |
RME |
Hydrological and Morphological Study for Planning and Design of 378.4m Bridge on the Gazaria-Manika via Dularhat-Anjurhat Road over Maya River at Charfassion Upazila in Bhola District |
Local Government Engineering Department |
2010 - 2010 |
National |
Completed |
632 |
FRM |
Application of Satellite Rainfall Estimation (SRE) in Hindu-Kush and Himalayan (HKH) Region |
IWM |
2010 - 2010 |
National |
Completed |
633 |
SDT |
Hydrographic Survey in the Tetulia at Char Kazal |
Dhaka |
2010 - 2010 |
National |
Completed |
634 |
WSU |
Water Supply, Drainage & Sanitation in 148 Pourashava |
Department of Public Health |
2010 - 2013 |
National |
Completed |
635 |
CPI |
On-the-job Training on Hydrodynamic and Morphological Model using MIKE 21 FM for NAHRIM Professionals |
NAHRIM |
2010 - 2010 |
National |
Completed |
636 |
FRM |
Development of flood forecasting model for Bagmati Basin, Nepal |
Dhaka |
2010 - 2011 |
International |
Completed |
637 |
WSU |
Ashulia Reservoir Study DWASA |
Dhaka Water Supply and Sewerage Authority |
2009 - 2010 |
National |
Completed |
638 |
SDT |
Survey for Design of Sandwip-Urir-Char-Noakhali Cross-dam under EDP |
CDSP |
2009 - 2010 |
National |
Completed |
639 |
WSU |
Dhaka Artificial Recharge, DWASA |
Dhaka Water Supply and Sewerage Authority |
2009 - 2011 |
National |
Completed |
640 |
FRM |
Modelling Study and Statistical Analysis to support Laksham-Chittagong Railway Line project |
Dhaka |
2009 - 2009 |
National |
Completed |
641 |
SDT |
Bathymetric Survey in connection with dredging of Gorai River |
Bangladesh Water Development Board |
2009 - 2013 |
National |
Completed |
642 |
SDT |
Bathymetric Survey in connection with Dredging of Gorai River |
Bangladesh Water Development Board |
2009 - 2013 |
National |
Completed |
643 |
WSU |
Kalyanpur Retention Pond Study |
Dhaka Water Supply and Sewerage Authority |
2009 - 2009 |
National |
Completed |
644 |
SDT |
Topographic Survey for earth filling work at the left bank of Karnaphuly River |
Local-Firm |
2009 - 2009 |
National |
Completed |
645 |
SDT |
Desk study on the transportation of heavy cargo from Chittagong port to Fenchuganj |
Under Ministry of Industry |
2009 - 2009 |
National |
Completed |
646 |
RME |
Hydrological and Morphological Study of Bangshi River and Dewali River for Construction of Bridges under Manikgonj |
Good |
2009 - 2010 |
National |
Completed |
647 |
FRM |
Climate Change Impact Assessment of Nepal |
- N/A - |
2009 - 2011 |
International |
Completed |
648 |
RME |
Hydrological and Morphological Study for the proposed Baniachong-Azmiriganj Road to connect Baniachong and Azmiriganj Upazilla under Habiganj District |
Good |
2009 - 2010 |
National |
Completed |
649 |
WSU |
Detail WQ Investigation for FS of Khulna Water Supply Project of JICA |
Dhaka |
2009 - 2010 |
National |
Completed |
650 |
SDT |
Survey for Char Mainka Cross-dam Project under EDP |
Dhaka |
2009 - 2010 |
National |
Completed |
651 |
RME |
Hydrological and Morphological Study for the proposed Road Bridge on Kushiara River Branch at Azmiriganj Upazilla under Habiganj District |
Good |
2009 - 2010 |
National |
Completed |
652 |
WSU |
DWASA WQ Monitoring & FS |
Dhaka Water Supply and Sewerage Authority |
2009 - 2010 |
National |
Completed |
653 |
CPI |
Impact of Climate Change and Sea Level Rise on Sungai Langat Estuary, Malaysia |
NAHRIM |
2009 - 2010 |
National |
Completed |
654 |
SDT |
Survey work at Surma River at Chattak at Lafarge Plant and Jetty Area |
LAFARGE |
2009 - 2009 |
National |
Completed |
655 |
CPI |
Monthly Hydrodynamic Prediction for Chevron to Assist Seismic Survey |
Canarail |
2009 - 2009 |
National |
Completed |
656 |
RME |
Hydrological and Morphological Study for the Proposed Road Bridge on Karatoya River at Ullahpara Upazilla under Sirajganj District |
Good |
2009 - 2010 |
National |
Completed |
657 |
FRM |
Assistance to CCA and DRR in the NE Region of Bangladesh |
Danish International Development Agency |
2009 - 2013 |
International |
Completed |
658 |
CPI |
Uttaron to prepare “Peoples Plan of Action for management of Rivers in Southwest Bangladesh |
Dhaka |
2009 - 2010 |
National |
Completed |
659 |
SDT |
Training of BWDB & EDP staffs on Hydrographic Survey under Estuary Development Programme |
Dhaka |
2009 - 2009 |
National |
Completed |
660 |
RME |
Padma Bridge Design Modelling |
HR Wallingford |
2009 - 2010 |
National |
Completed |
661 |
WSU |
Dhaka Water Supply ADB TA Project. |
Asian Development Bank |
2009 - 2016 |
National |
Completed |
662 |
CPI |
Monitoring the Effectiveness of the drainage system for removal of drainage problem in Noakhali Area |
Bangladesh Water Development Board |
2009 - 2010 |
National |
Completed |
663 |
SDT |
ADCP & Bathymetry Survey for Padma Bridge Project |
Dhaka |
2009 - 2014 |
National |
Completed |
664 |
WSU |
Ganges River Basin Modeling |
The World Bank |
2009 - 2010 |
National |
Completed |
665 |
SDT |
Cross section survey of the Kushiara River at near Bibiyana Gas Field, Sylhet |
Dhaka |
2009 - 2009 |
National |
Completed |
666 |
SDT |
Survey of the Ganges Barrage Project. |
Bangladesh Water Development Board |
2009 - 2011 |
National |
Completed |
667 |
FRM |
Index based flood insurance for Sirajgang District |
Dhaka |
2009 - 2009 |
National |
Completed |
668 |
WSU |
Mathematical Modelling for the Ganges Barrage Project |
Bangladesh Water Development Board |
2009 - 2016 |
National |
Completed |
669 |
IGW |
Groundwater Model Study for Rajshahi Barind Phase-III |
N/A |
2009 - 2012 |
National |
Completed |
670 |
CPI |
Economics of Adaptation to Climate Change- Bangladesh Case Study |
The World Bank |
2009 - 2010 |
National |
Completed |
671 |
WSU |
ADB: Strengthening the Resilience of the Water Sector in Khulna to Climate Change |
Asian Development Bank |
2009 - 2010 |
National |
Completed |
672 |
SDT |
Fixation of alignment for new road construction from Madani Avenue to Eastern By-Pass |
Rajdhani Unnyan Kortripaksha |
2009 - 2009 |
National |
Completed |
673 |
SDT |
Support to Pacific Marine Service in dredging of Outer bar area of Chittagong Port |
Local-Firm |
2009 - 2009 |
National |
Completed |
674 |
IGW |
KAFCO Area Groundwater Assessment and Impact on Environment |
Danish Hydraulic Institute |
2009 - 2009 |
National |
Completed |
675 |
ICT |
Resource Mapping in Teknaf and Ukhiya Upazilas |
UNICEF |
2009 - 2009 |
National |
Completed |
676 |
RME |
Juri River Bridge: Hydrological and morphological study for the bridge over the Juri River and road from Biyanbazar to Golapganj |
Good |
2009 - 2009 |
National |
Completed |
677 |
CPI |
Chevron: Coastal Hydraulic Study and Survey to Support Seismic Survey of Chevron |
Chevron Bangladesh |
2009 - 2009 |
National |
Completed |
678 |
RME |
Hydrological and Morphological study for the Kazi Bazar Bridge, Sylhet |
Good |
2009 - 2009 |
National |
Completed |
679 |
RME |
Gafargaon Bridge: Hydro-Morphological Study |
Local Government Engineering Department |
2009 - 2009 |
National |
Completed |
680 |
SDT |
River Bank Protection Monitoring at Kurigram |
Bangladesh Water Development Board |
2009 - 2010 |
National |
Completed |
681 |
WSU |
Portlink |
Port Link Ltd. |
2009 - 2010 |
National |
Completed |
682 |
WSU |
Monitoring and Assessment of Water Quality and Salinity of Modhumoti River |
None |
2009 - 2009 |
National |
Completed |
683 |
CPI |
Malaysia: Costal hydraulic and morphological study for Labuan Island |
NAHRIM |
2009 - 2009 |
National |
Completed |
684 |
WSU |
Geothermal Resource Exploration in Thakurgaon |
GTERM Limited |
2009 - 2011 |
National |
Completed |
685 |
WSU |
Geothermal Resource Exploration |
Geothermal Exploration Resource Management Ltd. |
2009 - 2011 |
National |
Completed |
686 |
SDT |
Lafarge Surma Cement Ltd. Navigability Survey |
LAFARGE |
2009 - 2009 |
National |
Completed |
687 |
IGW |
BADC: Flow assessment for Survey and Investigation of Minor Irrigation Improvement project Phase -2 |
Bangladesh Agriculture Development Corporation |
2009 - 2009 |
National |
Completed |
688 |
WSU |
HYSAWA Project, Phase-II for Noakhali Region |
Department of Public Health |
2009 - 2011 |
National |
Completed |
689 |
RME |
Lohalia River Bridge Hydrological & Morphological Study |
Local Government Engineering Department |
2008 - 2009 |
National |
Completed |
690 |
CPI |
Feasibility Study and Detailed Engineering Design for Long Term Solution of Drainage Problems in the Bhabadah Area |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
691 |
CPI |
Kobadak River Basin Drainage Management |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
692 |
FRM |
Update of FFWC Super Model for 2007 |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
693 |
FRM |
Baggardona drainage management Project (DUMMY for FMG Division) |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
694 |
SDT |
Survey of Jhilmil Project for Basic Dredging Co. Ltd |
Basic Dredging Co. Ltd. |
2008 - 2008 |
National |
Completed |
695 |
WSU |
Scheme Information Management System for WMIP |
Bangladesh Water Development Board |
2008 - 2014 |
National |
Completed |
696 |
IGW |
Conjunctive Use Potential of SW-GW for Malaysia |
Bureau of Innovation & Consultancy |
2008 - 2010 |
National |
Completed |
697 |
RME |
Sailabari Jamuna River Erosion Protection at Sirajgonj |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
698 |
CPI |
Update MES General 2D model for EDP |
Bangladesh Water Development Board |
2008 - 2010 |
National |
Completed |
699 |
WSU |
Barisal Sylhet Water Supply, Drainge & sanitation Project |
Department of Public Health |
2008 - 2009 |
National |
Completed |
700 |
WSU |
Alleviation of Waterlogging Problems in Chaktai and Moheshkhali Khal Catchments |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
701 |
FRM |
Monitoring of Hydraulic Performance of Causeways in Khaliajuri FCD Project |
Bangladesh Water Development Board |
2008 - 2013 |
National |
Completed |
702 |
FRM |
Khatlon Province Flood Risk Management Project |
Bangladesh Engineering & Technology Servces |
2008 - 2013 |
National |
Completed |
703 |
CPI |
Survey and Modelling of Sandwip-UrirChar-Noakhali Cross dam |
Dhaka |
2008 - 2009 |
National |
Completed |
704 |
ICT |
Development of a Data Management System for Hardware and Water Quality (HAWQ) for UNICEF |
UNICEF |
2008 - 2009 |
National |
Completed |
705 |
CPI |
Hydraulic Modelling Study for Deep Sea port |
Dhaka |
2008 - 2008 |
National |
Completed |
706 |
CPI |
Baggardona drainage management Project |
Bangladesh Water Development Board |
2008 - 2009 |
National |
Completed |
707 |
RME |
Sunamgonj Bridge at 1st km & Chhatk Bridge at 14th km of Gobindaganj-Chhatak-Dwarabazar Road on Surma River: Hydo-Morphological & EIA Study. |
Good |
2008 - 2009 |
National |
Completed |
708 |
FRM |
Flash Flood Forecasting in NE Region |
Care Bangladesh |
2008 - 2009 |
National |
Completed |
709 |
RME |
Numerical Model study for investigation of erosion/deposition process and assessment of impact of bank protection of Jamuna River at PIRDP |
Dhaka |
2008 - 2010 |
National |
Completed |
710 |
FRM |
Hydrological Modelling for Impact of Climate Change on Agriculture |
The World Bank |
2008 - 2008 |
National |
Completed |
711 |
SDT |
Topographical Survey for 450 MW power plant at Bibiyana, Habiganj |
Power Development Board |
2008 - 2008 |
National |
Completed |
712 |
IGW |
BADC: Feasibility Study for Augmentation of Flow for Supplementary Irrigation of Lalmonirhat district |
Bangladesh Agriculture Development Corporation |
2008 - 2008 |
National |
Completed |
713 |
SDT |
Current Measurement at Sonadia for Deep Sea Port |
Dhaka |
2008 - 2008 |
National |
Completed |
714 |
CPI |
“ Drainage and Sedimentation Study of Noler Char and Char Nangulia using Mathmatical Modlling” for the Char Development and Settlement Project –III (CDSP –III) |
Mott Mc |
2008 - 2008 |
National |
Completed |
715 |
FRM |
Mayakanan Lake City Mathematical Modelling |
Developer |
2008 - 2008 |
National |
Completed |
716 |
FRM |
Support to FFWC for CCA and DRR-Danida |
Danish International Development Agency |
2008 - 2011 |
International |
Completed |
717 |
IGW |
Math Modelling for Eng Design of KIP (North) |
HCL |
2008 - 2010 |
National |
Completed |
718 |
CPI |
Planning and Design of Beel Kapalia Tidal Basin for Tidal River Management (TRM) and Sustainable Drainage Improvement |
Bangladesh Water Development Board |
2008 - 2008 |
National |
Completed |
719 |
CPI |
Support to CWASA Water Supply Project (Dummy) |
Chittagong WASA |
2008 - 2008 |
National |
Completed |
720 |
WSU |
CWASA water supply project |
Chittagong WASA |
2008 - 2008 |
National |
Completed |
721 |
RME |
Monitoring of Hydraulic & Morphological Conditions for the safety of the JMB during 2008-09 |
JMBA |
2008 - 2010 |
National |
Completed |
722 |
CPI |
CDMP: Disaster Management Web Portal for CDMP |
CDMP |
2007 - 2009 |
National |
Completed |
723 |
CPI |
CDMP: Preparation of Tsunami and storm surge risk map |
Dhaka |
2007 - 2009 |
National |
Completed |
724 |
CPI |
CDMP: Identification of Tsunami and Storm surge vulnerable schools, emergency response and control buildings and evaluation of their adaptation capacity |
CDMP |
2007 - 2009 |
National |
Completed |
725 |
CPI |
Oil Spill Modelling |
CAIRN |
2007 - 2008 |
National |
Completed |
726 |
CPI |
Impact Assessment of Climate Change and Sea Level Rise on Monsoon Flooding |
Department of Environment |
2007 - 2008 |
National |
Completed |
727 |
IGW |
Installation of DTW Project Barind II |
N/A |
2007 - 2010 |
National |
Completed |
728 |
RME |
Study the causes of depression of West Guide bundh Slope of Jamuna Bridge |
Dhaka |
2007 - 2007 |
National |
Completed |
729 |
WSU |
Study on Well Field Construction for Immediate Supplement to City Water Supply From Nearby Ground water Sources |
Dhaka Water Supply and Sewerage Authority |
2007 - 2009 |
National |
Completed |
730 |
SDT |
Data Collection for Physical Scale Model Study Under STIFPP (Phase-II) |
SMEC |
2007 - 2007 |
National |
Completed |
731 |
RME |
Three Bridges at Khepupara, Hajipur and Mohipur respectively on the rivers Andhar Manik, Sonatola and Khaprabhanga Hydro-Morphological Study |
Good |
2007 - 2008 |
National |
Completed |
732 |
SDT |
Survey for CAD-II |
Dhaka |
2007 - 2008 |
National |
Completed |
733 |
FRM |
STIFPP-Phase-II Flood Management of 3 Districts |
SMEC |
2007 - 2007 |
National |
Completed |
734 |
CPI |
Integrated Planning for Sustainable Water Resources Management |
IPSWAM |
2007 - 2008 |
National |
Completed |
735 |
CPI |
Integrated Planning for Sustainable Water Resources Management (Dummy) |
IPSWAM |
2007 - 2008 |
National |
Completed |
736 |
WSU |
Analytical Framework (Strengthening of WARPO) |
WARPO |
2007 - 2009 |
National |
Completed |
737 |
WSU |
Model run with a number of withdrawal scenarios in Lakhya river |
EPC |
2007 - 2007 |
National |
Completed |
738 |
FRM |
Dhaka-Chittagong 4 Lane Expressway Hydrological Modelling Study |
SNC-Lavalin Int. |
2007 - 2008 |
National |
Completed |
739 |
CPI |
Bhola Town Protection 2nd Phase |
Bangladesh Water Development Board |
2007 - 2008 |
National |
Completed |
740 |
SDT |
G-K Intake Channel Survey |
Dhaka |
2007 - 2008 |
National |
Completed |
741 |
FRM |
Modhumati Town flood analysis. |
Metro Makers and Developers |
2007 - 2007 |
National |
Completed |
742 |
ED |
WWAP: Assistance to DHI |
Danish Hydraulic Institute |
2007 - 2009 |
National |
Completed |
743 |
CPI |
Land Reclamation Feasibility study of Bay of Bengal |
Bangladesh Water Development Board |
2007 - 2009 |
National |
Completed |
744 |
RME |
Gaibandha Erosion Protection Hydraulic Modelling Study |
Bangladesh Water Development Board |
2007 - 2008 |
National |
Completed |
745 |
WSU |
Establishment of Groundwater Monitoring System in Dhaka City for Aquifer Systems and DWASA production wells. |
Dhaka Water Supply and Sewerage Authority |
2007 - 2009 |
National |
Completed |
746 |
SDT |
NIKO Feni Gas Pipe Line Alignment survey |
Niko Resources Bangladesh Limited |
2007 - 2007 |
National |
Completed |
747 |
WSU |
Indian River Link |
WARPO |
2007 - 2009 |
National |
Completed |
748 |
WSU |
Khulna Water Supply Project |
Dhaka |
2007 - 2007 |
National |
Completed |
749 |
RME |
Balipara Bridge: Hydrological and Morphological Study at 14th km of Trishal-Nandail-Tarail Road on the Old Brahmaputra River |
Good |
2007 - 2007 |
National |
Completed |
750 |
SDT |
STIFPP-II Survey |
SMEC |
2007 - 2007 |
National |
Completed |
751 |
WSU |
Saidabad WTP Limited WQ monitoring with BUET |
BUET |
2007 - 2007 |
National |
Completed |
752 |
IGW |
Kurigram Irrigation Project (South Unit) |
Bangladesh Water Development Board |
2007 - 2009 |
National |
Completed |
753 |
IGW |
Kurigram Irrigation Project (North Unit) |
Bangladesh Water Development Board |
2007 - 2009 |
National |
Completed |
754 |
RME |
Katakhali Bridge RTW design on Karatoya-Bengali: Hydraulic Modelling Study. |
Good |
2006 - 2007 |
National |
Completed |
755 |
SDT |
Jhil Mil Project Topographic Survey |
Basic Dredging Co. Ltd. |
2006 - 2007 |
National |
Completed |
756 |
CPI |
Malaysia: Hydraulic study for mamgrove plantation on the coast of Melacca strait |
NAHRIM |
2006 - 2007 |
National |
Completed |
757 |
CPI |
Narayangonj Power Plant Hydraulic Modelling Study for proposed 360MW Combined Cycle |
Power Development Board |
2006 - 2007 |
National |
Completed |
758 |
CPI |
Sea-Level rise on Coastal communities and their Livelihood, in Bangladesh |
- N/A - |
2006 - 2007 |
National |
Completed |
759 |
CPI |
Pre-feasibilty Study for construction of River Harbour at KAFCO near the outfall of the Karnaphuli River |
Kafco |
2006 - 2007 |
National |
Completed |
760 |
ICT |
Development of WatSan Database Application for NGO Forum |
NGO Forum |
2006 - 2007 |
National |
Completed |
761 |
CPI |
Hydraulic Study of Langkawi Island-Ext-06 |
- N/A - |
2006 - 2006 |
National |
Completed |
762 |
SDT |
Survey for Basic Dredging Co. Ltd for Private Sea Port development at Chittagong |
None |
2006 - 2007 |
National |
Completed |
763 |
CPI |
Monitoring Effects of East Beel Khuksia TRM Basin and Dredging of Hari River for Drainage Improvement of Bhabadaha Area |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
764 |
CPI |
Meghna Power Plant Hydraulic Modelling Study |
Danish Hydraulic Institute |
2006 - 2006 |
National |
Completed |
765 |
RME |
Elasin Bridge RTW |
Good |
2006 - 2007 |
National |
Completed |
766 |
FRM |
WFP: Flood Innundation Maps for Highly Vulnerable Areas in Bangladesh |
World Food Programme |
2006 - 2006 |
National |
Completed |
767 |
RME |
Chatmohor Handial Hamkuria Road,Pabna |
Good |
2006 - 2007 |
National |
Completed |
768 |
RME |
Chatmohar Handial Hamkuria Road-Pabna (Dummy) |
Good |
2006 - 2006 |
National |
Completed |
769 |
FRM |
Flood Response Project. |
Asian Development Bank |
2006 - 2006 |
National |
Completed |
770 |
WSU |
Dhaka Environmental Pollution Study |
The World Bank |
2006 - 2007 |
National |
Completed |
771 |
IGW |
Tubewell Spacing Study |
N/A |
2006 - 2007 |
National |
Completed |
772 |
FRM |
Climate /Flood Forecast Applications for water related disaster mitigation in Bangladesh |
Care Bangladesh |
2006 - 2009 |
National |
Completed |
773 |
SDT |
NIKO Chatak Gas Pipe Line Alignment Survey |
Niko Resources Bangladesh Limited |
2006 - 2006 |
National |
Completed |
774 |
WSU |
Balu River,Lakhya River and DND Khal Water Quality Monitoring Assessment |
SWECO |
2006 - 2006 |
National |
Completed |
775 |
FRM |
FFWC(DHI) Advance Modelling Support. |
Danish Hydraulic Institute |
2006 - 2007 |
National |
Completed |
776 |
RME |
Hassail-Garurgao Protection against Padma erosion FS |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
777 |
CPI |
Nijhum Dwip Cross Dam |
Bangladesh Water Development Board |
2006 - 2006 |
National |
Completed |
778 |
FRM |
Nagpur-Chouhali Jamuna Dhaleswary Flood Erosion Protection Project. |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
779 |
CPI |
Protection Work in Coastal Embankment Project Polder 30 |
Bangladesh Water Development Board |
2006 - 2006 |
National |
Completed |
780 |
RME |
Teesta Barrage to Chandimari Teesta River Left Bank Protection Mathematical Modelling Study. |
Bangladesh Water Development Board |
2006 - 2007 |
National |
Completed |
781 |
CPI |
SMEC: Impact assessment of dredging and port for transport of coal from Khulna to Bay of Bengal. |
SMEC |
2006 - 2006 |
National |
Completed |
782 |
FRM |
Hydraulic Study of Rayer Mohal |
DPM Consultant Limited |
2006 - 2006 |
National |
Completed |
783 |
RME |
Horindhara-Ulia Bank Protection at left bank of Jamuna |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
784 |
WSU |
Dhaka Water Supply Project |
CarlBro |
2005 - 2006 |
National |
Completed |
785 |
WSU |
IRM- Chlan Beel Area Feasibility Study |
- N/A - |
2005 - 2007 |
National |
Completed |
786 |
WSU |
FMG-Chalam Beel Area Feasibility Study |
- N/A - |
2005 - 2007 |
National |
Completed |
787 |
WSU |
Feasibility Study of Integrated Water Resources Management of Chalan Beel Area |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
788 |
RME |
Chilmari Town protection Project |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
789 |
RME |
Godagari Bank Protection Work Design |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
790 |
RME |
Char Badrashan Protection Work:Feasibility(pc-11) |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
791 |
CPI |
Hari River dredging, assessment and monitoring |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
792 |
CPI |
Malaysian Sungai Langat Navigation Hydraulics Study. |
- N/A - |
2005 - 2007 |
National |
Completed |
793 |
FRM |
Karatoya River Navigation Improvement Project |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
794 |
RME |
Char Badrashan Protection: Detailed Feasibility SIA&EIA(0&M) |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
795 |
SDT |
Shibsha River upto Chalna Port Survey for Navigability |
Dhaka |
2005 - 2005 |
National |
Completed |
796 |
RME |
Hydraulic Modelling Study for Bridge on Surma River at Kanairghat |
Local Government Engineering Department |
2005 - 2006 |
National |
Completed |
797 |
SDT |
TATA Steel: Survey for Ful Bari Coal Mining Project. |
TATA Steel India |
2005 - 2005 |
National |
Completed |
798 |
CPI |
TATA Urea_Ammonia Plant in Bangladesh:Water Modelling Study. |
TATA Steel India |
2005 - 2005 |
National |
Completed |
799 |
FRM |
Dhaka Integrated Flood Protection Project |
Sir Willium Halcrow & Partners |
2005 - 2006 |
National |
Completed |
800 |
FRM |
Technical backstopping for FFWC Super Model. |
Bangladesh Water Development Board |
2005 - 2007 |
National |
Completed |
801 |
RME |
0506 RBB (B1B2) Monitoring |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
802 |
RME |
Hydro Morphological Study for Zia Nagar Bridge for Baleshwar River |
Good |
2005 - 2005 |
National |
Completed |
803 |
CPI |
Monitoring the Impact of protective works at Tazumuddin Upazila |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
804 |
RME |
Joysing Bridge Hydraulic Study |
Good |
2005 - 2006 |
National |
Completed |
805 |
CPI |
Morphological Forecast During Monsoon for Monitoring and Disaster Prepardness for Erosion Protection of River Meghna at Chandpur |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
806 |
CPI |
Khulna to Akrampur point Rupsha rivers Navigability Study for Coal mine. |
Dhaka |
2005 - 2005 |
National |
Completed |
807 |
WSU |
Saidabad WTP Intake Relocation |
Dhaka Water Supply and Sewerage Authority |
2005 - 2005 |
National |
Completed |
808 |
SDT |
Niko gas field Survey. |
Niko Resources Bangladesh Limited |
2005 - 2005 |
National |
Completed |
809 |
WSU |
Drainage Study for Dhaka Cantonment. |
Dhaka Water Supply and Sewerage Authority |
2005 - 2005 |
National |
Completed |
810 |
RME |
Hydraulic Design of Bridge on Ichamoti river and Hydrological assessment of proposed road alignment with cross-drainage route |
Good |
2005 - 2005 |
National |
Completed |
811 |
CPI |
Monitoring the Performance of Beel Kedaria TRM and baseline study for Beel Kukshia |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
812 |
IGW |
GW Resources & Hydro-Geological Investigation at Khulna City |
Local Government Engineering Department |
2005 - 2005 |
National |
Completed |
813 |
CPI |
Impact of Sea Level rise on Land use in the Coastal area . |
CEGIS |
2005 - 2006 |
National |
Completed |
814 |
RME |
0405 RBPP of B1 and B2 |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
815 |
FRM |
Buri Titas FCDI Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
816 |
RME |
Babupur-IndoBangla Protection at Panka_Narayanpur FS |
Bangladesh Water Development Board |
2005 - 2006 |
National |
Completed |
817 |
WSU |
Study on Drainage Master Plan for Dhaka City. |
Dhaka Water Supply and Sewerage Authority |
2005 - 2005 |
National |
Completed |
818 |
FRM |
Updating the FS of Mahuri-Kahua FCDI Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
819 |
FRM |
Modelling support to Feasibility Study for North Rajshahi Irrigation Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
820 |
FRM |
Updating the FS of Upper Surma Kushiyara Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
821 |
IGW |
Modelling support to Feasibility Study for North Kurigram Irrigation Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
822 |
IGW |
Modelling support to Feasibility Study for South Kurigram Irrigation Project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
823 |
IGW |
Modelling support to Feasibility Study for TCAD,P-II |
DPM Consultant Limited |
2005 - 2005 |
National |
Completed |
824 |
CPI |
Johor: Siltation study on tidal control gates |
Dhaka |
2005 - 2005 |
National |
Completed |
825 |
FRM |
Mathematical Modelling Study for Kaliajuri FCD project |
Bangladesh Water Development Board |
2005 - 2005 |
National |
Completed |
826 |
RME |
Hydrologic Study for Proposed Road in Doara Bazer in Sunamgonj. |
Niko Resources Bangladesh Limited |
2004 - 2005 |
National |
Completed |
827 |
SDT |
Niko Gas Pipe Line Alignment Survey,Chatak,Shunamgonj |
Niko Resources Bangladesh Limited |
2004 - 2005 |
National |
Completed |
828 |
CPI |
Impact Assesment for Climate Change |
Dhaka |
2004 - 2005 |
National |
Completed |
829 |
WSU |
DWASA Resource Assessment |
Dhaka Water Supply and Sewerage Authority |
2004 - 2006 |
National |
Completed |
830 |
WSU |
GIS, MIS Network Analysis |
Dhaka Water Supply and Sewerage Authority |
2004 - 2006 |
National |
Completed |
831 |
IGW |
Resource assessment and monitoring of DWASA |
Dhaka Water Supply and Sewerage Authority |
2004 - 2007 |
National |
Completed |
832 |
ICT |
Web Page for Dhaka WASA |
Dhaka Water Supply and Sewerage Authority |
2004 - 2005 |
National |
Completed |
833 |
FRM |
Surface Water Hydro and Modelling Fulbari coal mine development Project |
SMEC |
2004 - 2004 |
National |
Completed |
834 |
RME |
Hydraulict study of Badherhat-Khairchar road Project |
- N/A - |
2004 - 2007 |
National |
Completed |
835 |
CPI |
Training In MIKE 21 Software for Taidal Prediction and Analysis to Bangladesh Navy |
Danish Hydraulic Institute |
2004 - 2005 |
National |
Completed |
836 |
FRM |
Rehabilitation of existing haors in northeast region |
Bangladesh Water Development Board |
2004 - 2006 |
National |
Completed |
837 |
IGW |
Groundwater Management Study of Barind Project |
N/A |
2004 - 2006 |
National |
Completed |
838 |
RME |
Titporol & Debdanga Bankprotection modelling |
Bangladesh Water Development Board |
2004 - 2006 |
National |
Completed |
839 |
SDT |
Survey for Erosion Management at Chandpur |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
840 |
RME |
RBP system for UNOCAL on Kushiyara River. |
None |
2004 - 2005 |
National |
Completed |
841 |
SDT |
Survey component of 7 high risk polder |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
842 |
CPI |
Bank Protection of Meghna and Tentulia River(Daulatkhan) |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
843 |
CPI |
Tenjang Ketapang coastal |
Dhaka |
2004 - 2004 |
National |
Completed |
844 |
SDT |
Survey for Padma Bridge Modelling |
Dhaka |
2004 - 2004 |
National |
Completed |
845 |
CPI |
Rehabilitation of High Risk Coastal Polder |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
846 |
RME |
0304 RBPP (B1B2) Monitoring |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
847 |
RME |
Hydraulic modelling for Baradaha Bridge (Gobindaganj) |
- N/A - |
2004 - 2004 |
National |
Completed |
848 |
CPI |
CLASIC Project |
Natural Environment Research Council |
2004 - 2005 |
National |
Completed |
849 |
CPI |
Bhola Island Protection (Tajumuddin) |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
850 |
RME |
0203 RBPP (B1B2) Monitoring |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
851 |
CPI |
Chandpur Town Protection |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
852 |
SDT |
Monitoring of TRM under KJDRP area |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
853 |
FRM |
Belai Beel FCDI Project |
Bangladesh Water Development Board |
2004 - 2004 |
National |
Completed |
854 |
CPI |
Hydrological Monitoring KJDRP |
Bangladesh Water Development Board |
2004 - 2005 |
National |
Completed |
855 |
SDT |
Survey to Support RBPP Monitoring |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
856 |
ICT |
Software development for NGO Forum |
NGO Forum |
2003 - 2005 |
National |
Completed |
857 |
SDT |
Survey at Babupura in the Chapai Nawabganj |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
858 |
SDT |
Survey works for bank protection works at Bhola |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
859 |
RME |
Kapataksha River Re-excavation |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
860 |
SDT |
Development of Navigation Chart for Mongla Port Authority |
Mongla Port Authority |
2003 - 2004 |
National |
Completed |
861 |
SDT |
Rajuk linked Road Project |
- N/A - |
2003 - 2003 |
National |
Completed |
862 |
SDT |
X-Section Survey for re-excavations of kobadak |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
863 |
SDT |
Survey Component of Morphological Forecast study (Site B1 & B2) |
Bangladesh Water Development Board |
2003 - 2005 |
National |
Completed |
864 |
SDT |
Monitoring of Completed River training works at Panka narayanpur |
Bangladesh Water Development Board |
2003 - 2003 |
National |
Completed |
865 |
CPI |
EIA Lankwai Island |
MAB |
2003 - 2004 |
National |
Completed |
866 |
CPI |
MIKE 21 & LITPACK training to NAHRIM |
NAHRIM |
2003 - 2004 |
National |
Completed |
867 |
ICT |
Map and Data Sale |
- N/A - |
2003 - 2010 |
National |
Completed |
868 |
SDT |
Survey for JMB Forecast and Jamuna-Bangali Unification Study |
JMBA |
2003 - 2005 |
National |
Completed |
869 |
RME |
Morphological study for erosion prediction and mitigative measures at the viciniy of the Jamuna Bridge and structural measures against possible unification of the Jamuna and Bangali River |
JMBA |
2003 - 2005 |
National |
Completed |
870 |
SDT |
Survey Component of Groundwater Management and Zoning Study of NBDTW in Greater Dinajpur District |
Bangladesh Water Development Board |
2003 - 2005 |
National |
Completed |
871 |
SDT |
Topographic Survey & Mapping of Uttara Res. Model Town (3rd Phase) of RAJUK |
- N/A - |
2003 - 2003 |
National |
Completed |
872 |
FRM |
Mathematical Modelling for Feasibility Study of Chandpur-Comilla FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
873 |
IGW |
Groundwater Management and Zoning Study for Repair & Rehabilitation of DTW Project in Greater Dinajpur District |
Bangladesh Water Development Board |
2003 - 2006 |
National |
Completed |
874 |
SDT |
Survey for Chandpur Comilla Integrated FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
875 |
SDT |
Survey for Dewanganj Road Bridge Project |
Local Government Engineering Department |
2003 - 2003 |
National |
Completed |
876 |
FRM |
Dry season flow augmentation of Buriganga river |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
877 |
RME |
Hydraulic mathematical modelling including morphological prediction of Brahmaputra river in connection with the design of the proposed bridge over the Old Brahmaputra under thana Dewanganj, Dist, Jama |
Local Government Engineering Department |
2003 - 2003 |
National |
Completed |
878 |
SDT |
Survey works of feasibility study for improvement of Navigability of Mongla Port |
Mongla Port Authority |
2003 - 2003 |
National |
Completed |
879 |
CPI |
Feasibility study for improvement of navigability of Mongla Port |
Mongla Port Authority |
2003 - 2004 |
National |
Completed |
880 |
FRM |
Jamuna-Padma Left Bank Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
881 |
FRM |
Zia Nagar Hularhat FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
882 |
FRM |
Arial Beel FCDI Project |
Bangladesh Water Development Board |
2003 - 2004 |
National |
Completed |
883 |
SDT |
On line guidance of dredging works and Interim Survey of Southern Anchorage |
- N/A - |
2002 - 2004 |
National |
Completed |
884 |
RME |
Monitoring of Panka_Narayanpur RTW |
Bangladesh Water Development Board |
2002 - 2003 |
National |
Completed |
885 |
SDT |
Survey for Elasin Bridge Project |
- N/A - |
2002 - 2003 |
National |
Completed |
886 |
RME |
Hydrological and Hydro-morphological study of the Dhaleswary River in connection |
- N/A - |
2002 - 2003 |
National |
Completed |
887 |
SDT |
Survey Component of Flood Management in Gumuti River |
Bangladesh Water Development Board |
2002 - 2003 |
National |
Completed |
888 |
IGW |
Feasibility and Model Study for Rehabilitation of Flood Control Embankment on Both Banks of Gumti |
Bangladesh Water Development Board |
2002 - 2004 |
National |
Completed |
889 |
RME |
Capacity Building in the Field of Water Resources Engineering and Management in Bangladesh: Experimental Research on the Effect of Bottom Vanes on River |
Bangladesh Water Development Board |
2001 - 2005 |
National |
Completed |
890 |
FRM |
Updating and Validation of General Model & Six Regional Models |
Bangladesh Water Development Board |
2001 - 2005 |
National |
Completed |
891 |
CPI |
Hydraulic Modelling Study For 2nd CERP |
Bangladesh Water Development Board |
2001 - 2002 |
National |
Completed |
892 |
FRM |
Consolidation and Strengthening of Flood Forecasting and Warning Services |
Danish Hydraulic Institute |
2000 - 2005 |
National |
Completed |
893 |
HRD |
Training. on State-of-the Art Tec. for Water & Env. M |
- N/A - |
2000 - 2010 |
National |
Completed |
894 |
IGW |
Command Area Development Project of Teesta Barrage Project (Phase 1) |
Bangladesh Water Development Board |
1999 - 2004 |
National |
Completed |
895 |
SDT |
Expansion flood forecasting model & Improve inundation model in coastal and hotspot areas |
Bangladesh Water Development Board |
1995 - 1996 |
National |
Completed |
896 |
SDT |
Data Collection and Regional Model Validation for 2020 |
- N/A - |
1995 - 1996 |
National |
Completed |